Title Page

  • Project

  • Location
  • Project Manager:

  • Super/Foreman:

  • Conducted on

  • Inspected By:

  • P = PASSED; C= NEEDS CORRECTION; N = NOT APPLICABLE

FALLS

  • Fall protection at 6 feet or higher

  • Fall protection within 6 feet from the edge

  • Guard rails with 200 lbs. strength

  • Body harness / connectors / anchorage

  • Roof work protection (fall checklist)

ELEVATING EQUIPMENT

  • Scissor + harness + yo-yo + inspection

  • Boom + harness + lanyard/yo-yo + inspection

  • Forklift seat belt / lights / back-up alarm / sign

  • Ladders / step-ups / stilts in good condition

PPE

  • Hard hat & leather sturdy boots

  • Safety glasses; all the time

  • Ear plugs: impact and cutting tools

  • Gloves: carry studs and scrap metal

  • Respirator: insulation, sanding, mixing cement

  • Chop saw: face shield, safety glasses, waist height

ELECTRICAL

  • Power tools wit 3-prong or double insulated

  • Cords with grounding & color code tag

  • Portable GFCI (work with permanent power)

MATERIAL HANDLING

  • Lifting techniques

  • Wheeled carts next to chop stations

  • Loading / unloading area barricaded

  • Material hoisting (buckhoist or crane/rigging)

  • 5-gallon pails hoisted by straps

EMPLOYEE TRAINING

  • Weekly toolbox talks with roster signed

  • OSHA & DOL signs updated

  • Special warning signs posted

  • Training certifications current

  • Other: (Write in notes)

HYGIENE

  • Drinking water and portable cups

  • Portable potties in good condition

SCAFFOLD

  • Top-rails + mid-rails + toe-boards + tie-ins

  • Scaffold members on place (plasterers)

  • Swing stage / mast climber / other (write in notes)

  • Perry guard rails (4 feet), braces, chains, wheels

  • Inspection tags / checklists daily signed

TOOLS

  • Powder or gas actuated gun used safely

  • Power tools operable / guards on place

  • Chop saw; retractable guard + fire extinguisher

  • Dustless sanders with vacuum cleaner

WALKING/ WORKING SURFACES

  • Guardrails protecting edges / holes / shafts

  • Floor openings greater than 2 in. with covers

  • No obstructions walkways, stairwells, exits

  • Conduit sticking out on floor marked

  • Fans or air renovating equipment provided

  • Protection at ground level (working above)

FIRE PREVENTION

  • Fire extinguishers on place

  • Fire extinguisher next to welding & chop saw

  • Flammable away from ignition source

EMERGENCY PROCEDURES

  • First Aid kit and log available

  • Workers trained on emergency evacuation

  • CPR and First Aid certified on site

  • Eye wash readily available

HAZARD COMMUNICATION

  • SDS binder accessible to workers

  • Two SDS reviewed weekly with tool box talk

  • Containers with readable labels

  • Used powder actuated cartridges properly disposed

  • Other: (write in notes

OTHER

  • Housekeeping (egress / hallways / rooms)

  • "No harmless agreement" signed

NOTES: Topics showing "NEEDS CORRECTION" must be corrected immediately.

  • I do agree with the outcome of this inspection

  • I do not agree with the outcome of this inspection (use notes block below to give comments)

  • Add comments:

  • Signature (inspector)

  • Signature: (Supt. / Foreman)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.