Title Page

  • Conducted on

  • Prepared by

  • Location
  • Customer Name

  • Please take overall kitchen

Plumbing

  • All Sinks & Taps Installed & Tested

  • Photos of all Sinks and Taps & Plumbing

  • Dishwasher Installed & Tested

  • Dishwasher Pictures

  • Washing Machine Installed & Tested

  • Washing Machine Pictures

  • Any Other Plumbed Devices Tested and Pictures e.g Plumbed Fridge Freezer

Electrics & Appliances

  • All Sockets Tested

  • Fridge/Freezer/Wine Cooler installed & Tested

  • Fridge/Freezer/Wine Cooler Picture

  • Ovens/Warming Drawer/Microwave Installed & Tested

  • Ovens/Warming Drawer/Microwave Pictures

  • Hob Installed & Tested

  • Hob Picture

  • All Kitchen Lighting Installed & Tested

  • Pictures of Kitchen Lighting

  • All New Appliances Instructions Handed to Customer

Worktop

  • Kitchen Ready For Template (If Stone)

  • All Worktop Joins Correct (If Fitted By Fitters)

  • All Upstands Sealed & Chalked (If Fitted by Fitter)

  • Sink Sealed

  • Worktop & Upstand Pictures

Cabinets

  • All Plinths in place and attached, joins are acceptable

  • All Internals of cabinets free from damage and cut outs acceptable

  • All Doors & Drawers Leveled

  • All Handles Fixed

  • All Panels & Fillers To Wall Chalked

  • All Cut Panels to Floor Sealed

  • All Soft Close Hinges Working

  • All Pan Support Fitted

  • All Doors Free Of Damage

Cleaning

  • All Cabinets Have Been Dusted/Vacuumed Inside

  • All Surfaces Have Been Wiped

  • All Protective Coverings Have Been Removed

  • Floors Have Been Wiped

  • All Rubbish Has Been Removed (if applicable)

  • All Materials & Tools Have Been Removed

Flooring - Extras

  • Extra Work Completed

  • List Work Completed

  • Flooring Pictures

Building Work - Extras

  • Extra Work Completed

  • List Work Completed

  • Building Regulations Completed

  • Building Work Pictures

Tiling - Extras

  • Tiling Completed

  • Tiling Pictures

Electrics - Extras

  • Electrics Works Completed

  • List Extra Works Completed

  • Electrical Certificate Sent

  • Electrics Pictures

Plumbing & Gas - Extras

  • Plumbing & Gas Works Completed

  • List Works Completed

  • Gas Certificate Sent

  • Plumbing & Gas Pictures

Other Extra Works Conpleted

  • Other Extras Works Completed

  • List Other Works

  • Other Works Pictures

Last Day of Work Page

  • Completed by:

  • Date & Time

  • Location
  • Confirm all necessary next steps have been requested from the kitchen supplier

  • Fitters Signiture

Customer

  • I have reviewed the works on the last day of the works with the principal fitter

  • I agree the with the next steps identified

  • Customer Signiture

Sign off page

  • Completed by:

  • Date and Time

  • Location
  • I have reviewed all outstanding next steps from the last day and they are now completed

  • Fitter Signiture

  • Final Kitchen Overall Pictures

Customer Section

  • I have reviewed the outstanding items and all work has been completed to my satisfaction

  • Customer Signiture

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.