Information

  • Site Code - Site Name

  • Conducted on

  • Prepared by

  • Location
  • House Type

  • Plot No.

1.0 - RAINWATER INSTALLATION

  • Installed complete & to acceptable standard?

  • Add media

  • Comments

1.a Lead Work (Barratts Only)

  • Installed complete, plugged & Oiled?

  • Add media

  • Comments

2.0 - SOIL & VENT INSTALLATION

  • External stacks Installed complete & to an acceptable standard?

  • Provide Image

  • Comments

3.0 - SANITARY INSTALLATION

  • INSTALLED LEVEL, SECURE, VISUALLY SOUND, PROTECTED, OPERATIONAL, LEAK FREE

  • Add media

  • Please check site plans & confirm that the Sanitary has been positioned as per the "Working drawings"?

  • Please confirm that every Hot & Cold within the property are operating as they should be?

  • Add media

  • Please confirm that the Bath Blending valve is operating at the correct temperature?

  • Provide Image of the Temperature or state

  • Please confirm that the water outlets are running at the reduced flow rates for code properties

  • Comments

4.0 - KITCHEN SINK

  • LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Provide Image

  • STOP TAP BONDED

  • Provide Image

  • Bell are aiming for high standard under kitchen sinks & hope to see pipes wire wooled & clipped

  • Comments

5.0 - HEATING SYSTEM INSTALLATION

  • BOILER & PIPEWORK LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Provide Image

  • CYLINDER & PIPEWORK LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Has the Cylinder been Lagged, Labelled & Rosettes fitted?

  • Please check site plans & confirm that the Radiators have been positioned as per the "Working drawings" & Correct size as per the "Heating Designs"<br>

  • Please confirm Zone Valves are linked to the appropriate control stats?

  • Has the Flue been pointed Internally & Externally

  • Comments

6.0 - PAPERWORK

  • CP1 Completed?

  • Provide Image

  • 7.2 Flue Gas analyser results present?

  • Provide Image

  • Benchmark for Boiler completed? <br>

  • Provide Image

  • Benchmark for Cylinder completed? (If applicable)

  • Provide Image

7.0 - IS THIS PROPERTY 100% READY TO HANDOVER TO OUR CLIENT?

  • Property 100%

  • If NOT Please state reasons why and steps taken to ensure property is 100%

8.0 - COMPLETION CERTIFICATE

  • PHOTO OF COMPLETION CERT (Paper Copy)

9.0 - PROPERTY FEEDBACK

  • Did you have to make any minor repairs in this property?

  • Did you have to make any major repairs in this property?

  • Did you have to call the resident Plumber back to this property?

  • Please state plumber

  • How would your rate the quality of this property? 5 = Very Good, 4 = Good, 3 = Average, 2 = Poor, 1 = Very poor

  • Please state any feedback regarding the quality of this property

  • Please state how many hours/minutes you have taken making repairs in this plot

10.0 - MISCELLANEOUS INFORMATION OR DATA TO ACCOMPANY THIS REPORT

  • Add any property notes:

  • Add any additional pictures

11.0 - CIRCULATION & ADDITIONAL DOCUMENTATION

  • This Document should be sent to the following persons: c.bell@bell-plumbing.co.uk; i.kirsopp@bell-plumbing.co.uk; customercare@bell-plumbing.co.uk; k.taylor@bell-plumbing.co.uk

    Please Full Copies of CP1, FGA, Benchmarks with this email as separate attachements

12.0 - SIGN OFF

  • ON SITE REPRESENTATIVE - IF AVAILABLE

  • BPHL REPRESENTATIVE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.