Information

  • Site Code / Plot No.

  • Conducted on

  • Prepared by

  • Location
  • House Type

  • Plot Number

1.0 - RAINWATER INSTALLATION

  • 1.1 - INSTALLED COMPLETE

  • Has the gutter been run in full lengths with holes drilled for down pipes?

  • Does the gutter pass the dry verge without compromising the gutter or the dry verge?

  • If the roofers are not leaving the dry verges with cut outs for the gutter to pass please discuss with the site manager

  • Add media

  • Comments

2.0 - SOIL & VENT INSTALLATION

  • 2.1 - STRAIGHT, LEVEL, SECURE

  • Have all open ends been capped off with an appropriate fitting or tape?

  • Add media

  • Comments

3.0 - 1ST FIX INSTALLATION

  • 3.1 - STRAIGHT, LEVEL, SECURE, LAGGED, GAS TAPED, FOIL TAPED, SEGREGATED

  • Was the property clean, tidy & Safe to work when we arrived?

  • Have our Plumbers left the property clean, tidy & Safe? If NO Please take Photo evidence

  • Have our plumbers left Materials in the property? If YES please take Photo evidence

  • Add media

  • Comments

4.0 - SANITARY INSTALLATION

  • 4.1 - INSTALLED LEVEL, SECURE, VISUALLY SOUND, PROTECTED, OPERATIONAL, LEAK FREE

  • Add media

  • Comments

5.0 - KITCHEN SINK

  • 5.1 - LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Comments

  • Add media

  • 5.3 - STOP TAP BONDED

  • Comments

  • Add media

6.0 - HEATING SYSTEM INSTALLATION

  • 6.1 - BOILER & PIPEWORK LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Comments

  • Add media

  • 6.2 - CYLINDER & PIPEWORK LEVEL, SECURE, VISUALLY SOUND, OPERATIONAL, LEAK FREE

  • Has the Cylinder been Lagged, Labelled & Rosettes fitted?

  • Comments

  • Add media

7.0 - PAPERWORK

  • 7.1 - ALL PLUMBERS FORMS COMPLETED FOR THIS PROPERTY

  • Comments

  • 7.2 - FINAL COMPLETION CERTIFICATE COMPLETE & SIGNED BY SITE MANAGER

  • Comments

  • PHOTO OF COMPLETION CERT

  • GENERATE COMPLETION CERTIFICATE
  • CONTRACTOR

  • SITE LOCATION / NAME

  • DATE

  • PROPERTY
  • PLOT NUMBER

  • HOUSE TYPE

  • DATE WORKS STARTED

  • WORKS CARRIED OUT COMPLETE

  • DATE WORK COMPLETED

  • PRESENTED BY, ON BEHALF OF BPHL

  • SITE MANAGER

8.0 - MISCELLANEOUS INFORMATION OR DATA TO ACCOMPANY THIS REPORT

  • Add any property notes:

  • Add any additional pictures

9.0 - VISUAL CHECK SHEET

  • FOR THIS REPORT TO BE COMPLETE ALL DEFECTS PICKED UP ON STAGE QUALITY CHECKS MUST HAVE BEEN RECTIFIED PLEASE UPLOAD COPY/S OF THE QC SHEETS

  • QC SHEET

Sign Off

  • ON SITE REPRESENTATIVE - IF AVAILABLE

  • BPHL REPRESENTATIVE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.