Title Page

THEISS MBR ITP#1013 UNDERGROUND CONDUIT

  • STATION & LOCATION ie- Murrumba Downs Station

  • ITP number

  • INSPECTION / TEST POINT Check for latest drawings and co-ordinates

  • Compliance Criteria - Drawings Civil and electrical

  • Hold point- No

  • Method of inspection- Visual, Administrate

  • Person Responsible- Supervisor

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Excavate to required depth in accordance with relevant trench cross section

  • Compliance Criteria- Drawings, trench cross section, HV longituditional section, Datum point

  • Hold point- No

  • Method of inspection- Visual, measurement

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Install conduits- level

  • Compliance Criteria- Drawings, electrical specification

  • Hold point- Yes

  • Method of inspection- Visual, photographic

  • Insert photos as required

  • Photo
  • Trench photo

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Back fill trench-300mm layer

  • Compliance Criteria- Electrical specification- stabilised sand if required

  • Hold point- No

  • Method of inspection- Visual, measurement

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Compact trench

  • Compliance Criteria- Electrical specification

  • Hold point- No

  • Method of inspection- Visual,

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Install electrical or communications tape at correct level

  • Compliance Criteria- Electrical specification, AS/NZ 3000

  • Hold point- No

  • Method of inspection- Visual,

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Back fill trench-300mm layer

  • Compliance Criteria- Electrical specification- stabilised sand if required

  • Hold point- No

  • Method of inspection- Visual, measurement

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Compact trench

  • Compliance Criteria- Electrical specification

  • Hold point- No

  • Method of inspection- Visual,

  • Person Responsible- Leading Hand

  • Add signature

  • Comment

  • INSPECTION / TEST POINT Submit to Klenner Project Manager, including mark up of relevant area from Plan Grid

  • Compliance Criteria- Electrical specification

  • Hold point- No

  • Method of inspection- Visual, mark up plan

  • Location mark up

  • Person Responsible- Supervisor

  • Add signature

  • Comment

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.