Information

  • Document No.

  • Audit Title

  • Principal Contractor

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Trench detail audit

Trench Depth

  • Pipe diameter being installed

  • Mm total trench depth

Bedding depth

  • Depth achieves 700mm cover?

  • Depth controlled using at traveller rod?

  • Contractor has daily checks and records of depth available?

Reuse of material

  • Bedding

  • Hunching compacted?

  • Trench fill

  • Road base

  • Topsoil

Marker tape installation

  • Measured at correct depth

  • Installed using correct method

  • Daily records available and sighted

  • End point markers evident on bored sections

  • Bored sections are joined to remainder of line marker?

Obserrvations

  • Add media

  • Add drawing

  • Select date

Delivered pipe compliance check

Pies delivered summary

  • Load information

  • Load number
  • Pipe size

  • Pipe type

  • Number of pipes delivered

  • Location of pipe dump
  • Pipe dump number

Pipe identification

  • Pipe identification as per 1461.1 ( marked on pipe )

  • Provide comment re non marking of pipes

  • Is a non compliance report required?

  • Non compliance to be completed by

  • Date to be completed by

  • Date completed

Onside measurement checks

  • Pipe checks

  • Please complete:
  • Maximum outside diameter

  • Minimum outside diameter

  • Out of roundness (ovality)

  • Wall thickness

  • Pipe length

  • Pipe end squareness

  • Swarf removed

  • Add media

Alignment

Machinery Operator Qualifications

Confirmation of on site qualifications of employees

  • Enter employee qualifications

  • Operator
  • Employee name

  • A copy of each operator's qualifications is required. This should include but not limited to:
    - drivers licence
    - white card
    - machinery tickets
    - first aid
    - other relevant qualifications.

  • Take photograph of each licence and qualification.

Inductions

  • White card

  • Photograph of white card

  • VEC/KNMIS induction

Safety Signs

    Site signage audits
  • Select date

  • Alignment being worked on

  • Add location
  • Sign indicating minimum PPE requirements

  • Directional signage for site office and construction site. No unauthorised entry.

  • Entry and exit points to the workplace

  • Emergency evacuation muster areas

  • First aid facilities

  • Fire extinguishers

  • Hazardous materials

  • Hazards are identified

  • Add media

Spigot weld audit

General information

  • Contractor

  • Contract number

  • Welding operator

Pipe checks

  • Pipes being used

  • Pipe audit:
  • Add location
  • Correct pipe diameter for location

  • Pipe size being used

  • Correct PN being used

  • PN being used

  • Wall thickness

  • Ovality?

  • Pipe damage less than 10% of wall thickness?

  • Damage percentage

  • Add media

Welding

  • Correct size hole drilled? ( app 3 mm smaller than spigot OD)

  • I surface cleaned and inspected

  • Spigot inserted to achieve correct fit and depth?

  • Extrusion weld is 3 times spigot diameter?

  • Gusset installed is the correct size (75 mm long)? Weld is compliant?

  • Weld is aligned and good quality to the visual inspection?

  • Photograph of the weld in situ

  • Weld sent for testing?

  • Date sent

  • Date expected return results

  • Weld pass?

Poly test weld & inspection

General

  • Confirm operator is qualified

  • Welder/operator

  • Pipe welding audits. Additional audits can be completed by adding audit.

  • Pipe weld audit
  • Audit commenced

Pipe quality

  • Pipe diameter being installed

  • PN rating

  • Pipe diameter correct for site?

  • What size pipe was being installed and what corrective action has been implemented?

  • PN rating correct for location?

  • What PN is supposed to be used and what are corrective actions required?

  • Wall thickness

  • Ovality is acceptable

  • Pipe damage is less than 10% of wall thickness?

  • Damage percentage

  • Add media

  • Actions taken to rectify non compliance

Pipe clamping

  • Clamps fully engaged

  • Pipe firmly engaged

  • Pipe wall thicknesses match

Pipe cleaning oxide layer removal

  • Surface layer removed to adequate depth to remove oxide layer?

  • All scratches removed from the weld surface?

  • Off cuts removed from inside pipe

  • All off cuts contained for proper disposal

  • Surfaces cleaned with isopropyl alcohol wipes

Pipe alignment

  • Pipe mis-alignment <10% of wall thickness?

  • Weld surfaces mate square and true?

  • Surfaces mated while calculations are completed

Calculations

  • Calculations meet PIPA PO-003

  • Data input accurate?

  • Calculations performed correctly?

Bead up

  • Heat and pressure applied for correct time?

  • Internal and external bead formed?

  • Alignment of weld surfaces acceptable?

  • Add media

Heat soak

  • Surfaces correct distance from heater plate

  • Heat applied for full required period

  • Time heat applied for (minutes)

Surface mating

  • Heat plate removed quickly and cleanly

  • Weld surfaces mated immediately

  • Correct mating pressure attained

  • Pressure applied

Cool down

  • Time cooling commenced

  • Time cooling completed

  • Pressure maintained during cooling?

Visual inspection

  • Add media

  • Completed weld is aligned / good quality

  • Select date

Testing

  • Weld requested to be tested

  • Test result

  • Select date

Traffic management

  • Site location
  • Site risk

  • Assessment date

Traffic management plan

  • Approved by Contractor

  • Approved by Council

  • Reflects current situation

Performance requirements

  • Queue length stopped vehicles <200m

  • Stoppage duration =<10 minutes

  • Rotating yellow lights fitted to vehicles

Signage

  • "Roadworks" and "end of works" erected

  • "Multi message" signs

  • Speed limits acceptable

  • Trucks entering

  • In locations at correct spacing

  • Traffic controllers being used?

  • Qualified?

  • Obtain photo of qualification

Detours and side tracks

  • Diversion or road closure approved

  • Side track drawings approved?

  • Running surface sealed and line marked?

  • Dust control effective

Maintenance

  • Surface safe and trafficable?

  • Actions taken to correct

  • Hazard report submitted

  • Submitted by:

  • Date submitted:

  • Surface graded and watered

  • After hours maintenance undertaken

  • Description of after hours maintenance.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.