Risk Priority Rating:
X - Extreme Risk - extremely urgent, action IMMEDIATELY
H - High Risk - urgent, action AS SOON AS POSSIBLE
M - Medium Risk - action within ONE WEEK
L - Low Risk - not urgent, action within ONE MONTH -
Fire, Emergency and First Aid
FIRE.EMERGENCY AND FIRST AID
-
1. Emergency / Evacuation plans and instructions - available to all staff, and appropriately displayed.
-
2. Fire Extinguishers - are clearly marked in relation to type of fire use? Clear access (1m) kept to all fire fighting equipment?
-
3. Fire extinguishers / hoses / blankets - serviced and tagged every 6 months?
-
4. Exit Doors - clear access kept and easily opened from the inside? Adequate exit direction notices / signs clearly visible.
-
5. Flammable materials – are they stored and handled away from heat in a manner that there is no risk of fire?
-
6. First aid – access to kits, suitably stocked, signage for all treatments, kept clean, tidy and contents checked regularly. Gloves are included for first aid, blood injuries and biohazard procedures?
-
7. First aid training – do staff have current first aid certificate Is there a current list of First Aiders displayed
-
8. The area has audible evacuation alarm?
-
9. External exit doors can be opened from the inside without a key?
-
10. Emergency fire exits are signed?
Summary Fire, Emergency & First Aid
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Fire, Emergency and First Aid
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
UNRESOLVED HAZARD
-
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Floor, Walkways and Trip Hazards
ROOMS
-
10. The room is clean and tidy?
-
11. There is sufficient space for each person to work safely?
-
12. Floor surfaces are maintained in a safe condition and are suitable for the type of activities being conducted?
-
13. Walls and ceilings are safe and in good condition?
-
14. Steps/stairs/ramps are in a safe condition with non-slip surface and secure handrails where needed?
-
15. Doors,windows,locks and latches are in good condition and in working order?
-
16. The lighting is adequate ?
FURNITURE, FIXTURES AND FITTINGS
-
17. All furniture is safe and in good condition?
-
18. Light fittings/fixtures and ceiling fans are in a good condition and in working order?
Summary - Floor, Walkways & Trip Hazards
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Floor, Walkways and Trip Hazards
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
UNRESOLVED HAZARD
-
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Storage and Manual Handling
STORAGE AND MANUAL HANDLING
-
9. House keeping – all areas clean, tidy, and free of clutter?
-
10. Shelving - are free standing shelves and cupboards secured to ensure stability, and are items stored at a suitable height and within shelving width?
-
11. Containers – are there suitable containers used for storage, and are they suitably labelled
-
12. Gas Cylinders –pressurised cylinders stored correctly?
-
13. Manual handling – are staff aware of precautions / techniques to take when lifting or moving objects.
Summary - Storage & Manual Handling
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Storage & Manual Handling
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
UNRESOLVED HAZARD
-
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Workshop Management and Practices
CLASSROOM MANAGEMENT AND PRACTICES
-
14. Floor surfaces – kept clean, tidy and in good condition?
-
18. Lighting – Is there adequate lighting
-
19. Workstations/benches – are work heights appropriate?
Summary - Workshop Mgmt & Practices
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Workshop Management and Practices
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
UNRESOLVED HAZARD
-
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Electrical
ELECTRICAL
-
36. Electrical register - is one kept of all electrical items, tagged, tested & updated?
- portable items every 12 months
- non-portable items every 5 years -
37. Electrical power boards or equivalent – do they have overload cut off switch? Are double adapters removed from workplace?
-
38. Electrical – are plugs, sockets, switches, extension leads kept in good condition and maintained regular
-
39. Electrical - walkways clear of leads etc?
Summary - Electrical
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Electrical
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Hoists and Lifting Equipment
ROOMS
-
40. The room is clean and tidy?
-
41. There is sufficient space for each person to work safely?
-
42. Floor surfaces are maintained in a safe condition and are suitable for the type of activities being conducted?
-
43. Walls and ceilings are in a good condition?
-
44. Steps/stairs/ramps are in safe condition with non-slip surface, and secure handrails where needed?
-
45. Doors,windows, locks and latches are in good condition and in working order?
FURNITURE, FIXTURES AND FITTINGS
-
46. All furniture is safe and in good condition?
-
47. There is adequate ventilation?
Summary -Hoists & Lifting Equipment
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Hoists and Lifting Equipment
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Rotating Devices
ROTATING DEVICES (Grinding / Linishers / Lathes
-
46. Emergency Stop – are emergency stop facilities fitted on spinning or rotating devices?
-
47. Grinders – are work rests adequately adjusted to the wheel, and are guards fixed as per manufacturers recommendations? Are abrasive wheels “ring tested” before installation to ensure they are not fractured? (Test each new grinding wheel prior to installation by suspending on a screwdriver, cord or similar, tap wheel lightly with a metal object – a clear ring should be heard
-
48. Ventilation/Extraction - is there adequate particle extraction available and is it regularly maintained?
-
49. Lighting – Are only incandescent globes used over lathes and other variable speed devices? (fluorescent tubes may make rotating parts appear to be standing still or rotating slowly through a strobe effect
Summary - Rotating Devices
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Rotating Devices
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE:
Chemicals
CHEMICALS
-
50. Chemical Register – are all chemicals clearly labelled, listed, adequately stored, and registered regularly?
-
51. MSDS – are Material Safety Data Sheets available for all workplace chemicals?
-
52. Oily rags – are stored in steel bins with tight fitting lids
-
53. Training – is suitable training on workplace chemicals given to staff and students
-
54. Spill Control - procedures in place for chemical spills?
Summary - Chemicals
WORKPLACE HAZARD INSPECTION SUMMARY SHEET - Chemicals
-
Please complete the Workplace Hazard Inspection Summary Sheet and forward it to your Portfolio / Regional Manager and OSH Coordinator together with the above complete Inspection Checklist.
(Acknowledgement: Northern Territory Government, Department of Education and Training in the development of this Checklist.) -
RISK RATING
- LOW
- MEDIUM
- HIGH
- EXTREME
-
RECOMMENDED CONTROLS
-
BY WHOM
-
BY WHEN
-
INSPECTED BY: (Signature)
-
DATE:
-
PORTFOLIO / REGIONAL MANAGER ( Signature)
-
DATE:
-
OSH COORDINATOR (Signature)
-
DATE:
-
OSH COMMITTEE CHAIR (Signature)
-
DATE: