Internal
-
● Has the frame inspection been approved?
-
● Are all door openings framed to the correct size?
-
● Are all cavity sliders installed & fit in openings correctly?
-
● Are all specialty door pockets & trackes installed?
-
Location
-
● Have all noggins been installed for any specialty door tracks etc?
-
● Have all wall junctions been plumbed and nail off?
-
● Is bracing nailed back flush and on the hollow side of studs?
-
● Have all packers been nailed off and feathered at top and bottom?
-
● Have Internal wall brackets been installed correctly to wall top plates?
-
● Have all studs been straightened?
-
● Are all bulk heads and drop ceilings level and straight?
-
● Have noggins been installed for towel rails, toilet roll holders etc?
-
● Have noggins been installed for Garage door mounts?
-
● Have noggins been installed for stair handrail/wall junctions?
-
● Have change of direction noggins required for plaster battening?
-
● Is bath hob installed where required?
-
● Has villa board been installed to bath hob with angles?
-
● Has tile underlay been installed with plaster angle around perimeter?
-
● Are niches correctly framed with niche box installed?
-
● Are all windows plumb and square?
-
● Has front door and other external doors been installed with hardware?
-
● Is plumbing stacks and duct pipe framed in where required?
-
● Does the stair walls line up?
-
● Has the heating and cooling rough-in been completed?
-
● Has the plumbing rough-in been completed?
-
● Has the electrical rough-in been completed?
External
-
● Have all walls been straightened? Foam render wall N/A
-
● Has breather wrap been installed to all external walls?
-
● Have all aluminium window flashings been installed?
-
● Has wrap been taped on the outside of the window flashing?
-
● Have all windows been taped to wrap using thermakraft tape?
-
● Have eave sheets been installed level with joining strap?
-
● Has the external cladding been made 100% water tight?
-
● Is Cladding installed in accordance with install guides?
-
● Is there adequate drip edges for first floor cladding?
-
● Does all lower floor cladding cover bearers where applicable
-
● Does breather wrap extend below FFL?
-
● Has ember mesh been installed for the sub-floor if required?
-
● Have all external flashings been installed?
General
-
● Has the site been left clean and clear for the plasteres?
-
● Is the site bin empty ready for plaster offcuts?
-
● Have the internals been swept out?
-
● Have all leftover materials been stacked neatly and out of the way?
-
● Is the gate locked after every day?
Completion
-
Additional Comments
-