1st Fix Inspections
-
Drawing no. and Revision
-
Kitchen Drawing no. and Revision
-
Cables are installed to their final accessory boxes as per the drawing no. above?
-
Cables are securely fixed to the ceiling?
-
Cables are securely fixed to walls inc. capping if applicable
-
Cables are protected where passing through metal frames and walls
-
Cables are marked with height/locations and descriptions with marker pen (Grid outlets/stats)
-
Cables to be pulled through ceiling are identified with coloured tape?
-
All ELV cabling installed to final locations and segregated from LV by 50mm minimum?
-
Cables are supported using non combustible fixings on escape routes and 300mm from every penetration?
-
Downlight measurements taken? And offered to Supervisor/Contracts manager
-
Putty pads/ intumescent gaskets installed
-
Plot/area is left clean and tidy
-