Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Flight #
-
Gate #
-
A/C type
-
Destination
-
ETD
D-60
-
Local or connecting crew
-
Check if search-security sheet is completed and on-board
-
Scan gate area for special needs and provide tags
-
Freight/mail arrives plane-side
D-40
-
Flight leader and ACS conduct huddle- ETD goal
-
Verify all outbound crew members are accounted for in Crew Verification in SNAPP and ID checked
-
Verify with catering all galleries provisioned correctly with signed CSR
D-35
-
Cabin service and catering completed
-
Begin loading freight and mail. Local and transfer baggage arrives plane-side. Begin loading local baggage.
-
Prior to cargo load start, verify ship # against OB paperwork. Execute load/scanning and complete A/C load report
-
Boarding start
D-30
-
Screen carry-on baggage, monitor proper stowage space
-
LAVs svc'd?
-
Potable water svc'd?
D-15
-
If loading any dangerous goods, deliver the NOTOC to the flight deck
D-13
-
Begin retrieving gate-checked baggage from the boarding bridge. Secure wheelchairs, battery boxes, AVI and DG
D-10
-
Fueling complete and check head set for communication. Verify brakes set to remove chocks early
-
97% boarding complete
-
97% loading complete
-
Print AFAS* and MBU weather update completed
D-7
-
Begin rig and tow-bar hook-up to A/C
-
Notify ramp if any bags in jetway, collect flight dispatch release, signature and security sheet from Capt.
D-5
-
SAG/INOP APU flights- Cargo/boarding doors closed
-
Boarding door closed
D-3
-
Cargo door closed