Information
-
Audit Title
-
Site
-
Location
-
Contractor/s
-
Conducted on
-
Audit Conducted By
-
Other Personnel Present
-
What are the numbers of the pits to be inspected?
-
Are the pits in the right position?
-
Are the above pits the right dimension?
-
Is the internal form work acceptable?
-
Is the external form work acceptable?
-
Are pit walls set to at least 150 mm thickness?
-
Are pipes in place and sandbagged?
-
Is the contractor aware that they must vibrate the concrete when pouring the pit?
-
Take photos of the pit preparation.
-
Contractor to sign:
-
Council Representative to sign: