Information
-
Job Title
-
Client / Site
-
Document No.
-
Location
-
Conducted on
-
Prepared by
-
Personnel
JOB
-
Job Category
- New Installation
- Repair
- Other
-
Description
-
Job Type
- Light
- Powerpoint
- Fan
- AC
- Hot water
- Sensor
- Switchboard
- Circuit
- Other
-
Description
HAZARDS
-
Powered Tools
-
Falls
-
Manual Handling
-
Confined Spaces
-
Live Parts
-
Lone Worker
-
Ladders
-
Excavation
-
Falling Objects
-
Moving plant
-
Noise
-
Access / Egress
-
Asbestos
-
Working in Trenches
-
Dust
-
Scaffolding
-
UV radiation
-
Other
-
Other hazard:
SWMS
-
Working on or near Exposed Energized Electrical Equipment
-
Heights
-
Confined Spaces
-
Working Near Overhead Powerlines
-
Plant
-
Excavation and Trenching
-
Asbestos
-
Hazardous Substances
-
Demolition
-
Working on or near a road
PROCEDURES
-
Live testing
-
PPE Management
-
Risk Management and Hazard Intervention
-
Visual Safety Examination Inspection
-
Ladders
-
Electrical safety (general)
-
Inspection of safety equipment
-
Isolation Safety Tag and Lockout
-
Testing of Electrical Equipment and Installation
-
Manual Handling
-
Work on Electrical Equipment
-
Heights
-
Heights Rescue
-
Emergency Preparedness
-
CCICR (ceiling, crawling & conductive roofs)
-
Housekeeping
-
Noise Management
-
Plant and Equipment
-
Working in the sun
-
Testing and Tagging
-
Accessing a Pit or Pillar
-
Hazardous Substances Management
-
Working in the Vicinity of Exposed Live Parts
-
Excavation and Trenching
-
Safe working with Asbestos
LiCENCES AND EQUIPMENT
-
Competency Records / Licences
- electrical licence
- white card or equivalent
- scaffold > 3m erection licence
- EWP / Boom >11m lift licence
- other
-
High Risk Plant / Equipment being used
- EWP / Boom Lift >11m
- Scaffold
- Scissor Lift
- Forklift
- EWP Boom Lift <11m
- Excavator
- Hiab / Crane
- Other
-
Other:
RISK ASSESSMENT
-
Task
-
Task details
-
Hazards and Risks
-
Initial Risk Level
-
Controls undertaken to minimise risk:
-
Residual Risk Level
-
Risk Likelihood Matrix
-
Risk Decision Tree
-
If the residual risk is High or Catastrophic, permission must be sought by High Level Management for work to proceed.
-
Is the residual risk High or Catastrophic?
-
You must contact High Level Management before continuing.
CERTIFICATION
-
I certify that the above control measures have been implemented and deemed the site to be safe:
-
Additional workers:
-
Additional workers: