Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Work Brief (PWB)
-
Has the PWB been filled in adequately according to RLS-PR-005?
-
Have the hazards been identified and have controls been put in place?
Worksite Protection Plan (WPP)
-
Has the WPP been completed correctly in accordance to RLS-PR-006? Mandatory items to be included in the diagram.<br>1. Reference to capital city in the top left hand corner of the grid;<br>2. An easily reached safe place;<br>3. The name of the track / tracks;<br>4. The worksite location defined whether or not in the danger zone by km, crossover numbers, point’s number and signal number and<br>5. The name of locations or stations each side of worksite.
-
Has the Diary Log been filled in with appropriate information that includes all dialogue including overlapping limits?
Communication
-
Are communication protocols established within the work group?
Fatal and Severe Risks
-
Is one or more of ARTC's Fatal and Severe Risks occurring on site?
- Vehicle Accidents (Incl RRV)
- Manual Handling
- Struck by Rail Traffic
- Rail Traffic Collision
- Struck by Mobile Plant
- Contact with Electricity
- Hazardous Chemicals, Hot Materials and Confined Space
- Crushed by Crane or Lifted Load
- Fall From Height
- Contractor Management
- Not Applicable
-
Are ARTC's Life Saving Behaviors displayed?