Information

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Brief (PWB)

  • Has the PWB been filled in adequately according to RLS-PR-005?

  • Have the hazards been identified and have controls been put in place?

Worksite Protection Plan (WPP)

  • Has the WPP been completed correctly in accordance to RLS-PR-006? Mandatory items to be included in the diagram.<br>1. Reference to capital city in the top left hand corner of the grid;<br>2. An easily reached safe place;<br>3. The name of the track / tracks;<br>4. The worksite location defined whether or not in the danger zone by km, crossover numbers, point’s number and signal number and<br>5. The name of locations or stations each side of worksite.

  • Has the Diary Log been filled in with appropriate information that includes all dialogue including overlapping limits?

Communication

  • Are communication protocols established within the work group?

Fatal and Severe Risks

  • Is one or more of ARTC's Fatal and Severe Risks occurring on site?

  • Fatal and Severe Risk Picture.png
  • Are ARTC's Life Saving Behaviors displayed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.