Title Page
-
Conducted on
-
Prepared by
-
Facility
-
Location
-
General Comments/Observations
Safety Leadership & Training
-
Managers/Supervisors are recognising and rewarding good safety practices
-
Supervisors are participating in investigations and following up corrective actions
-
Supervisors/Manager disciplining inadequate WHS behaviours
-
There is evidence of low tolerance for non-adherence to critical controls
-
Leaders including front line have completed training in how to complete an effective inspection
-
Leaders including front line have completed training in how to complete an incident investigation
-
Leaders including front line have completed training in how to complete an effective safety observation
-
Leaders including front line have completed training in how to effectively use OneSafe including entering an incident, hazard, near miss and closing out corrective actions
-
Leaders including front line have completed safety leadership training
-
Leaders including front line have completed training in how to complete an effective risk assessment
-
Leaders including front line understand the exposures, controls and tolerances for the activities/tasks completed in their accountability
-
Relevant leaders including front line have completed effective WHS committee training
-
Leaders including front line have completed training in how to use the risk register and verify controls are in place
-
Leaders including front line have completed training in how to effectively use the Safety Leadership Journal
Safety Plans
-
Responsibility/accountabilities for actions have been allocated
-
Tasks listed on the plan is being completed
-
There is evidence available to demonstrate that actions are being completed
-
Percentage of plan complete
-
Plan and progress on plan is discussed at the facility WHS Committee
Risk Register
-
Risk register in place and being utilised
-
Verification of risk register and implementation of controls listed on risk register is occurring
-
Controls outlined on the risk register are in place and/or where not in place there is evidence the facility is working towards resolutions
-
Where incident have occurred facility reviews risk register and outlined controls to identify deficiencies and/or controls that were not in place
-
Risk register is reviewed as part of monthly WHS Committee
-
Facility has identified localised exposure and identified controls
Traffic Management and LSE Operational
-
Speed limits being enforced and adhered to (vehicles, motorcycles, forklifts)
-
Dedicated pedestrian access ways being used
-
Facility specific Traffic Management Plan in place and displayed
-
Walkways and other areas clearly marked e.g. driver safety zones
-
Signage and line markings are unobstructed
-
The controls listed on the risk register have been implemented
-
Forklift operators are wearing seatbelts
-
Mobile phones and/or personal listening devices not being used whilst operating LSE
-
Operator drives backwards (reverse) when a load is elevated blocking forward view
-
Shunting of pallets or ULD’s is not occurring
-
Forklift Halo Lights are in place and calibrated to 3m
-
Daily pre-start checks are completed on LSE
-
Forklifts are only operated by licensed operators
-
During Loading and Un-loading of vehicles, drivers remain outside exclusion zone
-
Exclusion zone breaches identified by NCC are closed out with evidence of actions
-
LSE Operators are only carrying/lifting 2 ULD’s at a time
-
LSE operators stop operation when a pedestrian enters into exclusion zone
-
Barriers have been installed to physically separate LSE and pedestrians
-
Forklift minimum standards have been implemented into facility
-
Keys are removed from forklifts when not in use
Manual Handling/ OEP Program
-
Verification of the manual handling exposure listed on the risk register has been completed
-
Where applicable, recommendations outlined within OEP reports are being actioned
-
Manual handling task observations are occurring
-
Pre-start warm ups are being completed
-
Workers have completed manual handling training relevant to the task they perform
-
Localised activities to reduce manual handling injuries have been identified and in place
Emergency Management
-
Emergency plans & folders in place and up to date?
-
Evacuation floor plans in place and up to date and displayed
-
Facility performed a Fire Drill/ Emergency evacuation in the last 12 months
-
All Wardens trained and is the warden list current?
-
Facility has performed a Spill Response/ Suspicious Substance/ Bio hazard Drill in the last 12 months
-
Fire fighting equipment checks in date
WHS Committees
-
Current WHS Committee Meeting template being used
-
WHS Committees meeting are held at prescribed intervals
-
Items listed on the agenda are being closed out in a timely manner
Personal Protective Clothing And Equipment (PPE)
-
All PPE is in good condition and in date
Housekeeping
-
The facility and office area is generally free from rubbish build up
-
There are no combustible materials in close proximity to fuel (including LPG) refuelling facilities.
-
Walkways & Exits are clear and free from obstructions
-
Perimeter walls/fences are free from rubbish and debris
Noticeboards
Are all required documents on the noticeboard i.e
-
WHS Policy
-
HSR/Deputy HSR List
-
First aiders
-
Most recent WHS committee meeting minutes
-
Emergency procedures including list of wardens and evacuation plan
-
Most recent Starting with Safety Communication
Hazard, Near Miss, Incident Review & One Safe
-
Leaders understand how to enter incidents, hazards and near misses into OneSafe
-
Leaders understand how to close out corrective actions arising from incidents, hazards and near misses entered into OneSafe
-
Correctives actions entered into OneSafe are closed out with specified timeframes
-
Incident trends have been identified and corrective actions implemented
-
Hazard, Near Misses and Incidents are tabled and reviewed at the facility WHS Committee meeting
Inspections (where applicable)
-
Forklift daily pre-start checks are completed
-
Vehicle daily pre-start checks are completed
-
Motorcycle daily pre-start checks are completed
-
Electric Delivery Vehicles daily pre-start checks are completed
-
Quarterly Safety Inspection Checklist are completed
-
Copies of “Customer Profile & Site Safety Inspection” are available for all customers and have been reviewed in last 2 years
Senior Leader Investigations
-
Safety Leader investigations, where applicable, are tabled at the facility WHS committee
-
Facility based corrective actions outlined on the Senior Leader investigation have been actions
-
Critical control verification have been completed as part of Senior Leader investigation
Contractor Management (General)
-
Only approved contractors are being used
-
Contractors inducted and provided with a work permit?
-
Contractors have supplied WMS/JSA’s? If yes are they less than 2 years old?
-
Have the cleaning contractors supplied SDS’s?
-
Has the facility conducted on the spot monitoring to ensure that the Contractor is complying with WMS, site safety rules etc?
-
Do they label decanted substances? If so are the labelled correctly?
-
Have the relevant APG staff been trained in APG Contractor Management procedures (ie are there training records)
SiF & Critical Control Verification
-
Critical control verifications are being completed
-
Where critical control verification identified that a critical control is not in place actions are taken to close these out
-
Facility has a SiF working party in place
-
Facility knows its SiF activities and which recorded incidents are SiF potential/SiF Actual
Chain of Responsibility (Where Applicable)
-
Driver daily fitness for duty declarations being completed correctly and checked by supervisors
-
Driver run sheets are being completed correctly with drivers showing the correct regulatory Work/Rest hours, and checked and signed by the Supervisors
-
Driver medicals up to date
-
Non-conformances and breaches entered into the driver and heavy vehicle compliance register?
-
Drivers with speeding infringements are managed in line with relevant procedure
-
Checks are in place to monitor contractor arrival/departure times
-
All products being dispatched have an accurate weight affixed to the ULD/pallet?
-
Customers providing accurate weights on the ULD’s and Pallets they dispatch
-
Appropriate approved load patterns affixed to the inside of the rear doors of each heavy vehicle
-
Load sheets accurately completed and checked on the required journeys, e.g. line haul
-
Container weight declarations (CWD’s) completed correctly for all shipping container movements
-
Inbound and outbound load restraint checks being conducted and checked by the Supervisors
-
Correct load restraint certifications and Standard Operating Procedures affixed to the inside of rear doors of each heavy vehicle
-
The load restraint equipment used in good working order and condition, e.g. no frayed straps
-
Drivers have access to the correct load restraint equipment to secure their loads when at customer’s premises
-
Heavy vehicle pre-departure checks are being conducted and recorded correctly and being checked/signed by the Supervisors
-
Vehicles are being serviced at the correct intervals
-
All identified vehicle roadworthiness faults are being repaired prior to the vehicle being put back into the operation
-
All heavy vehicle defect notices are actioned with required repairs and cleared, then entered into the Driver and Heavy Vehicle non-conformance register.
Contractor Management (Delivery Contractors)
-
WHS Safety plan in place for the current contract period
-
WHS Safety plan reviewed/audit in 12 months
-
All Mail contractors have completed an induction for all Australia Post sites they will be working at
-
All Mail contractors have identified hazards relevant to their work and have implemented controls to reduce exposures
-
All Mail contractors incidents have been reported to Australia Post
-
All Mail contractor incidents have been investigated and appropriate safety controls set up to stop the incident from happening again.
-
All Mail contractors have current licenses and qualifications required by the law and Australia Post to perform assigned work
-
All Mail contractors are maintaining and regularly inspecting their vehicles, plant & equipment
-
All Mail contractors are monitoring your own safety performance.
-
All Mail contractors are meeting their Chain of Responsibility (CoR) requirements for vehicle > 4.5t GVM.
-
All Mail contractors have provided a Fatigue Management Plan that records and demonstrates how they manage fatigue risks required for vehicles > 12t GVM
Dangerous Goods (Where Applicable)
-
Process in place for ensuring compliance in regards to DG documentation held in the cabin of each vehicle for DG consignments being transported, both local and linehaul.
-
DG handling, in regards to awareness, compatibility, correct orientation if applicable, loaded at the rear of vehicles in line with company policy.
-
Packaging being used for DG consignments, correct labelling in regards to class of DG contained within the packages, pallet.
-
Access to the DG regulations applicable for the mode of transport is available
-
Availability of additional PPE, such as Hazspill equipment, and the conduct of monthly audits to ensure all items are available and in date.
-
Update Evacuation plan, fire wardens and first aiders list up to date.
-
Firefighting equipment tested and tagged.
-
General housekeeping including fire exit signs working and exits not blocked by freight.
-
DG training of staff up to date.
Dog Prevention (Where Applicable)
-
Workers know and understand that they are empowered not to make a delivery if an unrestrained dog is present on the property
-
Dog Hazard Register in place
-
All rounds have identified and listed the location of dogs
-
Where applicable, ultrasonic devices are in place and being used
-
Scanning failures where a dangerous dog prevents delivery removed from first time attempt KPI’s
-
Letters informing customers of not being able to make delivery due to dog are in place and being used
-
Engagement with local council regarding dogs is in place
Motorcycle Replacement Program (Where Applicable)
-
Does the facility have an ongoing desktop review of rounds to be converted in conjunction with NDMT modelling?
-
Are local round conversions being risk assessed and respective processes being followed correctly including HSR consultation?
-
Are rounds being actively converted?
-
Are round conversions being tabled at local LWG meetings?
-
Is the Dead Ride/journey policy being actively reviewed in conjunction with round conversions and recasts e.g. updated round maps and agreed routes?
Planned Workplace Changes (Where Applicable)
-
Planned workplace changes have been communicated to relevant workers
-
Consultation has occurred with HSR regarding planned workplace changes
-
Risk assessments have been completed on the planned changes and identified exposure and controls are listed on the facility risk register
Other
-
Hi visibility clothing/vests worn by all staff/visitors, where required
-
Visitors are being escorted
-
There is evidence that visitors and contractors are signing into the facility
-
Too Box Talks, Starting with Safety and Weekly safety communications are being delivered
Observations
-
Positive Observations
-
Opportunities for Improvement
Sign Off
-
Reviewed and checked by Facility Manager or Delegate:
-
Sent to GM, TM or similar suitable level by:
-
Conducted by: