General Information

  • TNR Representative

  • POC Representative

  • Jobsite Name

  • Location
  • Date & Time

Pre-Inspection Checklist

Ladders & Stairways

  • Correct Ladder and Properly Used for the Task

  • Ladders in Good Condition

  • Secured and at a 4:1 Pitch

Personal Protective Equipment

  • Work Boots Worn

  • Hard Hats - Overhead Hazard

  • Safety Glasses - Task Specific

  • Gloves Worn - Different Types Available Per Task

Internal Assessment

  • Current Active Leak(s)

  • Ceiling

  • Purlins - Distance Apart

  • Leak Location Reference Point (Internal)
  • Linear Feet From N or S

  • Linear Feet From E or W

Roof Assessment

Roof System

  • Metal

  • Built Up Roofing (BUR)

  • Modified Bitumen

  • Thermoplastic Polyolefin (TPO)

Surface Damage & Pitch

  • Are there any tears, holes, or punctures?

  • Pitch

  • Leak Location Reference Points (External)
  • Linear Feet From N or S

  • Linear Feet From E or W

  • Images

  • Anomaly Description

4 Corner Photos (Roof)

  • North West Corner

  • North East Corner

  • South West Corner

  • South East Corner

Roof Analytic

  • Width

  • Length

  • Area SqFt

  • Purlin Distance

  • Curb

  • Drain

  • Skylight

  • Gas Line

  • Antenna

  • Pipe Vent

  • Fiberglass

  • HVAC Unit

  • Exhaust Fan

Parapet Wall

  • Wall Height

  • Wall Width

  • Wall SQFT

Metal Roof

  • Panel Width

  • Valley Linear Feet

  • Vertical Panel Linear Feet

Condition (Metal Roof)

  • Skylights

  • Fiberglass

  • Ridge Cap

  • Coping Cap

  • Hip & Ridge

  • Vertical Seams

  • Horizontal Seams

  • Expansion Joint (structural movement)

  • Protruding Fasteners (loose backing out)

Condition (Single Ply, Mod-Bit, BUR)

  • Ponding Water

  • Drains (overflow)

  • Sealant Deterioration (curbs/penetrations)

  • Voids (improper weld)

  • Loose Laps Seam Separation

  • Shrinkage, Peeling, Bubbling

  • Aging & Material Deterioration (discoloration, blistering, cracking)

Other Conditions

  • Gas Line

  • Antennas

  • Derbris (debris, branches, scrap material, etc.)

Additional

  • Photos

  • Notes

Close Out

Additional Contractor

  • #1 Other

  • #2 Other

  • Inspection Review With

  • Audit Completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.