General Information
-
TNR Representative
-
POC Representative
-
Jobsite Name
-
Location
-
Date & Time
Pre-Inspection Checklist
Ladders & Stairways
-
Correct Ladder and Properly Used for the Task
-
Ladders in Good Condition
-
Secured and at a 4:1 Pitch
Personal Protective Equipment
-
Work Boots Worn
-
Hard Hats - Overhead Hazard
-
Safety Glasses - Task Specific
-
Gloves Worn - Different Types Available Per Task
Internal Assessment
-
Current Active Leak(s)
-
Ceiling
-
Purlins - Distance Apart
Leak Location Reference Point (Internal)
-
Linear Feet From N or S
-
Linear Feet From E or W
Roof Assessment
Roof System
-
Metal
-
Built Up Roofing (BUR)
-
Modified Bitumen
-
Thermoplastic Polyolefin (TPO)
Surface Damage & Pitch
-
Are there any tears, holes, or punctures?
-
Pitch
Leak Location Reference Points (External)
-
Linear Feet From N or S
-
Linear Feet From E or W
-
Images
-
Anomaly Description
4 Corner Photos (Roof)
-
North West Corner
-
North East Corner
-
South West Corner
-
South East Corner
Roof Analytic
-
Width
-
Length
-
Area SqFt
-
Purlin Distance
-
Curb
-
Drain
-
Skylight
-
Gas Line
-
Antenna
-
Pipe Vent
-
Fiberglass
-
HVAC Unit
-
Exhaust Fan
Parapet Wall
-
Wall Height
-
Wall Width
-
Wall SQFT
Metal Roof
-
Panel Width
-
Valley Linear Feet
-
Vertical Panel Linear Feet
Condition (Metal Roof)
-
Skylights
-
Fiberglass
-
Ridge Cap
-
Coping Cap
-
Hip & Ridge
-
Vertical Seams
-
Horizontal Seams
-
Expansion Joint (structural movement)
-
Protruding Fasteners (loose backing out)
Condition (Single Ply, Mod-Bit, BUR)
-
Ponding Water
-
Drains (overflow)
-
Sealant Deterioration (curbs/penetrations)
-
Voids (improper weld)
-
Loose Laps Seam Separation
-
Shrinkage, Peeling, Bubbling
-
Aging & Material Deterioration (discoloration, blistering, cracking)
Other Conditions
-
Gas Line
-
Antennas
-
Derbris (debris, branches, scrap material, etc.)
Additional
-
Photos
-
Notes
Close Out
Additional Contractor
-
#1 Other
-
#2 Other
-
Inspection Review With
-
Audit Completion