Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • The Audit consists of a series of questions under Ten headings. Each is an attempt to judge your company's compliance with certain lean system criteria. Use the slider to approximate your response. Zero being poor or not assessed Ten being fully implemented and supported by everyone in the company.

1.0 - Business Culture

  • 1.1 Plant Management communicates organisational objectives with all employees and gives feed back on employee satisfaction survey at least twice a year with opportunity to discuss employee satisfaction.

  • 1.2 Employees are able to accurately describe what are the company's objectives and how their job help the company to achieve those objectives.

  • 1.3 Employees at every level are empowered to work in groups to address improvements in all aspects of the business ( Quality, Cost, Delivery, Improvement, Safety, Morale, Environment)

  • 1.4 Production technical support and support staff routinely go to shop floor to assess actual situation and talk to the production workers.

  • 1.5 There is good effective communication between production shifts in the plant.

2.0 - Lean Culture

  • 2.1- The Plant has developed a lean strategy that ties into their current policy deployment and has key milestones and deliverables.

  • 2.2- Senior management team has been trained in lean manufacturing and are active in deployment.

  • 2.3- There is a dedicated champion for continuous improvement in the plant with necessary resources, organisation and infrastructure in place.

  • 2.4- Employees have been trained in CI methods and understanding of Lean Manufacturing. Be satisfied by independent questioning of employees.

  • 2.5- Shop floor employees understand common performance metrics to monitor and improve production processes.

  • 2.6- Continuous improvement projects are structured, planned and time bound with milestones (production staff)

  • 2.7- Continuous improvement projects are structured, planned and time bound with milestones (management)

  • 2.8- There are processes in place to solicit the ideas from the work group/employees and recognise the success of these activities conducted by the work group.

  • 2.9- the results of CI activities are implemented throughout the plant.

  • 2.10- Continuous improvement have been rolled out beyond the shop floor.

3.0 - 5S and Visual Communication

  • 3.1- The plant is general clean of all unnecessary production material, equipment and scraps.

  • 3.2- Aisles are kept clear of all obstructions.

  • 3.3- Floor markings clearly distinguish work areas, paths, and material handling aisles.

  • 3.4- Signs clearly define production material, industrial material,inventory staging and material drop areas.

  • 3.5- All employees are considerate of housekeeping and operators consider daily cleaning and put away activist as part of their job.

  • 3.6- There is a place for everything and everything has a place, consider containers, tools, racks, gauges, and fixtures clearly marked and labeled.

  • 3.7- Standardised display boards are available throughout the plant contain key information such as job training, safety , QA data, operational measurables And problem countermeasures.

  • 3.8- Display boards are frequently updated for QA and productivity data (target v actual data) Operators receive regular feedback on team performance.

  • 3.9- Call signals are used to call for assistance when a problem is encountered by a worker or machine.

  • 3.10- Check sheets describe and track the top defects (internal and external) are posted and updated for each workstation. each worker is aware of the key quality points and defect history of the process they are doing, samples or photographs are posted to aid judgement.

4.0 - Standardised Work

  • 4.1- A Standard Operating Procedure (SOP) have been developed for each production process, SOP contain cycle times and process task sequence for each process

  • 4.2- SOPs are used to train operators for every production process, show evidence of training log book.

  • 4.3- Each production process has an SOP posted within direct view of the operator

  • 4.4- SOPs are in a formate that allows ease of understanding and training.

  • 4.5- Each process has been designed to be complete within a standard cycle time (TAKT)

  • 4.6- Operators provide input and are involved in the process of job design and standardisation.

  • 4.7- SOPs are dated, issue controlled and have a clear indication of changes/improvements have been made, why and when.

  • 4.8- Frequently repeated, non production operations in the plant are standardised, such as changeover routines QA equipment checks

  • 4.9- SOPs throughout the plant are regularly audited for completeness and adherence.

5.0 - TPM

  • 5.1- All operators and managers know the aspects of TPM

  • 5.2- All employees have knowledge of and adherence to safety regulations relative to their work area.

  • 5.3- There are planned maintenance schedules for all key equipment and tools including lubrication plans

  • 5.4- Machine productivity, breakdowns and repairs are recorded and analysed to identify improvements.

  • 5.5- There is a managed spare part inventory for each equipment type.

  • 5.6- Operators preform and analyse simple maintenance tasks according to designated check sheets and standards on a daily basis.

  • 5.7- The maintenance performance is continually monitored i.e. % of maintenance complete, response time, OEE

  • 5.8- The equipment maintenance performance is regularly monitored and resources allocated.

6.0 - Quick Changeover

  • 6.1- Changeover schedules are communicated in enough time to enable adequate preparation of tools, material and equipment.

  • 6.2- Changeover times and abnormalities are visibly tracked and countermeasures developed.

  • 6.3- Teams have received training in quick changeover procedures and are actively improving methods.

  • 6.4- Changeover process have been subjects of detailed process analysis , such as motion,time studies and videotaping.

  • 6.5- As a new changeover procedure is developed they are standardised and replicated in other areas.

  • 6.6- All tooling, equipment and materials required for the next production run are prepared as per documentated process and located close to the point of use and highlighted when ready.

  • 6.7- When not in use all equipment, tools, fixtures are stored in a neat, orderly fashion and are maintained in good working order.

  • 6.8- Special tools, fixtures and equipment have been designed to reduce change over time where cost effective.

7.0 - Quality and Error Proofing

  • 7.1- There is a formalise quality feedback process that allows operators to to receive feedback from both internal and external customers. QA System

  • 7.2- Defective items are immediately detected when they occur in the production process. Very seldom does a bad part make it to a downstream process or to a customer. Check reject loop and hold areas

  • 7.3- A quality system exists to address supplier quality issues in the production process.

  • 7.4- Workers understand the basics of error proofing.

  • 7.5- There USA formalised system in place for either production operator or team to analyse defects and identify error proofing opportunities.

  • 7.6- Evidence exists to prove error proofing devices have been implemented to eliminate the top production defects for each work area in the plant.

  • 7.7- Error proofing devises have been installed and are visually identified and monitored for effectiveness and are maintained in a sound working order.

  • 7.8- Error proofing devices and methods have been applied to prevent defects in both manual and automated processes

8.0 - Level Production

  • 8.1- Is there an effort to level production schedules by spreading the monthly customer demand evenly over the period, so that the daily production volume for part does not vary substantially.

  • 8.2- Is the effort to level production schedules working to meet customer requirements over the long and short term.

  • 8.3- The production rate throughout the manufacturing system has been defined around the TAKT time. If the process has a fixed cycle time is that sh Lowed down by a particular issue.

  • 8.4- Kanban quantities are reviewed so that the reorder points and quantities Min,Max and safety stock levels are correct to the current production rate

  • 8.5- Change over in production are made to support the mix of customer demands and are not supported my long production runs, WIP, Inventory Buffers or daily short ship emergencies

9.0 - Problem Solving

  • 9.1- Is there a focus in the company towards skilled people to work through issues, problems and difficulties that arise in the work environment. (Problem solving tools root cause analyse)

  • 9.2- Do people understand the importance of collecting and using data so that the invisible becomes visible.

  • 9.3- Does the company have the ability to identify the different strengths in people

  • 9.4- Are people across the site willing to be involved in problem solving, addressing the source of the problem instead of the "quick fix"

  • 9.5- Does the focus of problem solving involved facts rather than personalities

  • 9.6- Do people work together in teams with great ease?

10.0 - Statistical Control

  • 10.1- Does the company have a method of improving productivity and profitability via the application of statistical problem solving tools to identify and quantify waste and indicate steps for improvement?

  • 10.2- Does the company measure the following: Defects and their costs?

  • 10.3- Does the company measure the cost of excessive cycle time and delays

  • 10.4- Are metrics used to identify correct processes and reduce costs

  • 10.5- Are metrics aligned with the company strategy , linked to bottom line results.

  • 10.6- Are metrics related to important, regular activities and processes

  • 10.7- Are metrics used to identify what factors are critical to the quality for your customer

  • 10.8- Are statistics displayed on visual controls throughout the site and there is support to promote and provide information about these measures?

  • 10.9- Have there been any projects implemented to locate cost of poor quality in your process via the use of statistics?

  • 10.10- Does the company know what to measure and why?

SignOff

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.