Information

  • LMS Audit - Production

  • Plant audited

  • Conducted on

  • Auditors :

  • 650- Production

650.1 Documentation

  • Is the documentation reviewed conform ?

  • Switch ON for more informations

  • Procedures: 750-PRC-0008
    Instructions: -
    Forms/validation: See the DMS Complete Document lIst to verify the revision of 5 documents
    BRC REF: Section 3.1,3.2.1, section 3.3

650.2 Training

  • Is the training up to date according to training plan ? Validate the training for 5 employees (position, GMP´s, allergens, etc.)

  • Switch ON for more informations

  • Procedure: 150-PRC-0001
    Instructions: 910-TRN-0001
    Forms/validation: 150-FRM-0003 to 150-FRM-0018, 150-FRM-0021, 150-FRM-0057
    BRC REF: 1.1.5, section 7.1, 5.2.9

650.3 non-conformities raised during the last audit are corrected adequately?

  • Validate the last audit´s CAR. Are they solved? Measures in place, to prevent the situation to happen again, effective? Action plan submitted for long term CAR?

650.4 Specific Procedures

  • 650.4.1 Data's mesure and analysis : control in production

  • Switch ON for more informations

  • Are mesures, analysis and control in production adequate and done according to the planned frequency? Are packaging controls adequate and done according to the planned frequency (Sealing, identification, weight)? Is overweight reduction is followed on a regular basis against fixed objectives? How the tare weights is verified? Howe min and max weignt are sets?

    Procedure: 750-PRC-0005
    Instructions: -
    Forms/validation : SAP
    BRC REF: Section 6.1 and 6.2
  • 650.4.2 Waste management

  • Switch ON for more informations

  • Are waste or rework re-use only in compatible products? (See compatibility charts)? Are waste or rework identified and stored adequately? Is the rework turnover made? Is the rework traceablilty assured?

    Procedure: -
    Instruction: -
    Forms/ validation: 650-FRM-0009 to 650-FRM-0012, 650-FRM-0076, 650-FRM-0140, 650-FRM-0141, 650-FRM-0066, 650-FRM-0146
    BRC REF : 5.2.5, 3.9.3
  • 650.4.3 Production planning Process<br>

  • Switch ON for more informations

  • Allergen management to validate. Sanitation needs. Raw material needs validation

    Procedure : 750-PRC-0004 (section 2)
    Instruction : -
    Forms/ validation : -
    BRC REF: -
  • 650.4.4 Identification and traceability<br>

  • Switch ON for more informations

  • Stock rotation, ingredients identification, work in progress and finish products, in production , in storage/ warehouse, consumption

    Procedures : 750-PRC-0003
    Instructions : 750-INS-0007
    Forms/validation: Production posters
    BRC REF : -
  • 650.4.5 Control in production<br>

  • Switch ON for more informations

  • Go on site to see how controls are made. Take any instruction and validate that instructions are followed (formula, sampling, data collection, etc.). Are frequency's respected?

    Procedures : 750-PRC-0005 (point 3)
    Instructions : 650-INS-0001 to 650-INS-0148
    Forms/validation: SAP, 650-FRM-0001 to 650-FRM-0008 and 650-FRM-0011 to 650-FRM-0172
    BRC REF : Section 6.1 and 6.2
  • 650.4.6 Cleanliness plant validation<br>

  • Switch ON for more informations

  • Verify the order, cleanliness and general apperance in production zones. Is 6S system applied and maintained?
    Procedures : -
    Instructions : -
    Forms/validation: -
    BRC REF : 4.8.1 to 4.8.3, 4.8.6, 4.8.7 to 4.8.9, section 6.1, 6.2, 6.3 (+calibration certificate)
  • 650.4.7 Operator's pre-op conformity<br>

  • Switch ON for more informations

  • Are food contact surfaces pre-op inspections done and adequatly documented in SAP? Is it done every start up shift and at changeovers? Validate how they do their inspection.

    Procedures : -
    Instructions : -
    Forms/validation: SAP, 710-FRM-0217, 710-FRM-0218, 710-FRM-0219, 710-FRM-0220
    BRC REF : -
  • 650.4.8 Product contamination risks validation on site

  • Switch ON for more informations

  • Is there food contamination risks (foreign bodies, insects, chemical products)? Validate the knif blade sharpening and the metallic object pre-op inspection. Validate if wood contamination can occure (pallet, tool handle, etc.)

    Procedures : -
    Instructions : 750-INS-0038 750-INS-0032
    Forms/validation: 650-FRM-0138
    BRC REF : 4.9.2.1, 4.10.1.4, 4.9.4.1
  • 650.4.9 GMP's / Employee's Manual

  • Switch ON for more informations

  • Validate all subject discussed in the employee's manual (interview employees). Validate is plaster is warned on a hand if the hand is covered by a glove. Wwearing jewelry? If medic alert chain validate with production manager if the employee is authorized (FRM-750-0175 and 0176)

    Procedures : -
    Instructions : 750-INS-0003
    Forms/validation: -
    BRC REF : 5.2.4, 7.1.1, 7.2.1 to 7.2.3 and 7.2.5, section 7.3, 7.4.1,4.11.5
  • 650.4.10 Allergen Control

  • Switch ON for more informations

  • Is the Allergen Control Program effective? ( See planning, cleaning, reworked products, identification, storage, employees routes, containers, aprons)

    Procedures : -
    Instructions : 750-INS-0011
    Forms/validation: -
    BRC REF: -
  • 650.4.11 Flow diagrams validation

  • Switch ON for more informations

  • Are the flow diagrams have benn reviewed il the last year? Be sure that all flow diagrams are up to date and covers: chemical products, raw material, finish products, employee's routes, water distribution system (potable and waste), waste, allergens.

    Procedures : -
    Instructions : -
    Forms/validation: 750-DRW-0001 to 750-DRW-0013
    BRC REF : 4.9.2.2 pour DRW-0004, 4.3.2, 4.5.2, 5.2.3, CAC cahier de charge
  • 650.4.12 Production Planning and Control

  • Switch ON for more informations

  • Validate the procedure is followed

    Procedures : 750-PRC-0004 (section 2.2)
    Instructions : 750-INS-0002
    Forms/validation: 350-PRC-0001, 750-PRC-0005, 820-PRC-0001, 750-PRC-0003, 150-PRC-0001
    BRC REF : 3.8.1
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.