Audit
JSA filled out properly
Is there handwritten input?
Are persons trained for their individual tasks
Proper warning signs posted at entrance
All personnel in proper PPE
All personnel trained and certified for their specialized operation
Location has designated smoking area
Wind sock Available?
Additional Comments
Flanges have all bolts and are the correct size and properly torqued and tested
All valve handles are correctly installed for proper use
Valves capable of venting to atmosphere are capped & a means of bleed off installed.
Tree pressure tested at shop to maximum anticipated pressure/ API standard
Verify that the # of turns to (FULLY) open/close each valve and choke are written on the wellhead and are correct
Additional Comments
No threaded connections leak upstream of choke manifold
All flow iron upstream of choke must be tested to 10k and 5k downstream of choke banded/identified every 6 months
Break apart ALL threaded connections and visually inspect before EVERY flow line installation
Tested to maximum anticipated pressure + an acceptable safety margin or working pressure
Unions are positioned correctly for direction of flow & checked for compatibility
Lines are not bowed or laid in a bind
Additional Comments
Have personnel who install restraints received training, if so by whom?
Set as not to cause excessive dips, arches, or bows in flow lines
Set first Flow Line Restraint as close to wellhead as feasible placing one every joint- upstream of manifold every other joint- downstream of manifold with hammer union positioned between the Flow Line Restraints.
On flow lines, are all angels and unions tied down from the wellhead to open-top tanks
Additional Comments
When completely closed- reading is 0/64
Pressure test body to same pressure as flow line
Housing and seat checked prior to flowing of Well
Additional Comments
Clean sand prior to transport
Set level must be in conjunction with transfer pumps.
Tanks grounded
Trucks using bonding cables
Adequate fall protection or tie-offs(built in or portable platforms if properly secured will suffice)
Easy access for tank gauging, walkways and stairs should not be damaged or missing pins
External valves not in use have barrier device installed in case of accidental opening
Set to provide easy truck access for hauling out produced fluids
Working wind sock installed near tank
Additional Comments
H2S plan provided for well that may exceed 10 PPM
H2S site specific procedures developed for location (if required)
H2S contingency plan on location (if required)
H2S plan is coordinated by safety department and implemented by foreman
Additional Comments