Information
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Contractors present
Location
-
Company
-
Is there existing damage to the lease gate and/or cattle guard?
-
Is there means to properly sign in/out upon entry/exit of location?
-
Is the location EAP posted?
-
Is proper safety signage posted at entry of location?
-
Is a designated smoking section assigned?
-
Are windsocks in place around location?
-
Additional Comments
Frac Tanks
-
Company
-
Quick connect pipe from fresh water source free of leaks or damage.
-
Water manifold to tanks free of leaks, all valves to operate present , and in containment if re-use water is used. Ref. I.S.
-
All lines from manifold into tank secured to tank.
-
Tanks set level.
-
Stairs, handrails, and walkways pinned, connected and not damaged, with no open holes. Ref. RP54 9.3.8, 1910.24(h)
-
Frac tanks grounded, if required. Ref. RP2003 4.5.2
-
Valves double blocked when not in use.
-
Additional Comments
Hydration Unit
-
Company
-
-
Suction hoses from frac tank to hydration unit free from abrasions, cuts, and gouges. Hose rated to 100psi. With factory ends. Ref. RP54 16.1.7/OEM
-
Stairs and walkways free of clutter and undamaged. Hand rails up and pinned. Ref. RP54 9.3.8, 1910.24(h)
-
SDS of all chemicals on site. Ref. 1910.1200
-
Chemicals are properly labeled. Ref. 1910.1200
-
All personnel wearing proper PPE per SDS. Ref. 1910.1200, CHK Policy, 1910.132
-
F.E.'s charged, inspected and ready for service. Ref. RP 54 20.3.4, 1910.252(a)(2)(ii)
-
Hydration unit free of leaks.
-
Hoses from hydration to blender free from abrasions, gouges, and cuts. Hose rated to 100 psi with factory ends. Whip checks installed properly. RP54 16.1.7/ OEM
-
Additional Comments
Blender
-
Company
-
Is the blender within containment?
-
Containment free of holes and sides are up.
-
Hydraulic hoses in vicinity of turbo sheathed. Ref. RP54 16.1.7
-
Blender free of leaks.
-
Radiation source (densitometer) labeled, closed, and locked. Ref. 1910.1096(j)
-
All personnel wearing proper PPE per SDS. Ref. 1910.1200
-
Valves double blocked when not in use on suction and discharge side.
-
Hoses on discharge side of blender to missile free from abrasions, gouges, and cuts. Are hoses rated for the anticipated pressure? Ref. RP54 16.1.7, RP54 9.13.3
-
Are restraints in place on all hoses, and are they properly rated for the application?
-
F.E.'s charged, inspected and ready for service. Ref. 1910.252(a)(2)(ii)
-
Stairs and walkway free of clutter and undamaged. Hand rails are up and pinned. Ref. RP54 9.3.8, 1910.24(h)
-
Rotating equipment at sand screw appropriately guarded ref. 1910.219(c)(2)(i)
-
Are the blender, hydration unit, and silos caution taped off? Ref. API 5416.1.10
-
Additional Comments
Silos/Sand Haulers
-
Company
-
Are the silo generators grounded properly?
-
Rotating equipment and belts have all guards. Ref. 1910.219(c)(2)(i)
-
Are wheel chocks being used properly by sand haulers?
-
Is respiratory signage in place near the silos?
-
Is there a spotter located at front of silos to assist haulers in backing?
-
F.E.'s charged, inspected, and ready for service. Ref. 1910.252(a)(2)(ii)
-
Appropriate PPE worn, P-100 respirators or better. Ref. 1910.132
-
Additional Comments
Missile
-
Company
-
Is only 1 authorized person in the high pressure area during operations to look for leaks while testing or pumping? Ref. API 5416.1.10
-
Hoses on missile free from abrasions, gouges, and cuts. Are hoses rated for the anticipated pressure? Ref. RP 54 16.1.7, RP 54 9.13.3
-
Are restraints in place on all hoses? And are they properly rated for the application?
-
Do all valves have handles. Ref. industry standard
-
All brackets on missile have bolts and tightened. Ref. industry standard
-
Are all valves not in use capped?
-
F.E.'s charged, inspected, and ready for service. Ref. RP 54 20.3.4, 1910.252(a)(2)(ii)
-
Bars available for isolation valves.
-
Additional Comments
Pump Trucks
-
Company
-
Wheel chokes in place. Ref. industry standard
-
F.E.'s charged, inspected and ready for service. Ref. RP 54 16.1.10
-
Is only 1 authorized person in the high pressure area during operations to look for leaks while testing or pumping?
-
Is there caution tape up or no go zone designated?
-
Guards in place over transmission and drive shaft. Ref RP54 16.1.7
-
Hydraulic hoses in vicinity of turbo sheathed.
-
Bars for isolation valves readily available.
-
Are all Tri-Max units functional?
-
Additional Comments
Hoses to Well Head
-
Company
-
Are the 6-port skids grounded?
-
Do the manifold cranes have all pins and keepers in place?
-
Are the manifold cranes properly stowed for pumping operations?
-
Is only 1 authorized person in the high pressure area during operations to look for leaks while testing or pumping?
-
Is there caution tape up or no go zone designated?
-
Are all safety restraints in place for the HP hoses?
-
Are safety restraints installed properly?
-
Is the HP hose properly covered with the spiral protective wrap?
-
Isolation valves have bar readily available. Ref. Industry Standard
-
Additional Comments
Well Head
-
Company
-
Area around hydraulic lines for BOP or hydraulic valves free of leaks. Ref. Manufacturer Recommendation
-
All valves have handles installed and number of turns to open and close on trees.
-
Frac stack has platform installed or man lift on location. Ref. RP54 5.5.1
-
All flanges have all bolts and not short bolted. Ref. RP54 6.4.10
-
Cellar has been cleaned out filled in to CSG valve less than 4 ft. And properly guarded. Ref. API 54 7.1.9, API RP 54 6.7.2
-
Flow back tie in(see FB Checklist)
-
Hydraulic valves have 1 male and 1 female fitting.
-
BOP hoses have crush proof sheaths. Ref. RP53 12.5.2
-
Is the frac head, hydraulic valve, BOP, and B section accompanied with test chart. Ref. RP 53 17.3.7
-
Additional Comments
Wireline
-
Company
-
Unit chocked, positioned 50ft. From well head, and grounded. Ref RP54 13.8.6, RP67 2.9.1, 3.7, RP54 13.2.1
-
F.E.'s charged, inspected, and ready for service. Ref. RP54 16.1.10
-
Lower wire line sheave secured to well head. Ref. RP54 13.4.5
-
Wireline BOP tested in open and closed position. Ref. RP54 13.6.2 & 13.6.3
-
Wireline unit caution taped off. Ref. RP54 12.1.7
-
Wireline personnel maintain 75 ft. Rule from wellhead when testing or pumping. Ref. RP54 16.1.10, BMP frac standard
-
Are wireline personnel giving crane operator clear signals?
-
Additional Comments
Lubricator
-
Company
-
Lubricator marked with permanent serial number. Ref. RP54 13.6.5c
-
Lubricator tested, banded, and inspected on annual basis. Ref. RP54 13.6.2
-
Weight of lubricator marked on lubricator. Ref. Manufacturer Recommendation
-
Lubricator has 2 bleed valves. Ref. RP54 12.5.2
-
Personnel check for pressure prior to removing lubricator. Ref. RP 54 12.5.4
-
Lubricator bleed valves cycled after pressure bleed off. Ref. RP54 12.5.11
-
Are personnel using tag lines and staying out from under suspended loads. Ref. RP54 6.2.12
-
Are tag lines being inspected prior to use and free from any damage?
-
Additional Comments
Crane
-
Company
-
Cr/Op certified and knowledgable. Ref. 1910.180(b)(3)
-
Provide Certification # and Expiration Date:
-
Cr/Op has performed a documented daily inspection. Ref. 1910.180(d)(2)(i)
-
Annual inspection on crane is up to date. Ref. 1910.180(d)(2)(ii)
-
Has all rigging equipment been inspected and is it properly rated for the task? (check all wire ropes, sheaves, drum rigging, hardware and attachments) Ref. Industry standard
-
Outriggers out and pads under them. Ref. 1910.180(h)(3)(i)(a)
-
Is the approriate boom angle being used for the weight of the load? Ref. 1910.180(h)(1)(i)
-
Cones out to identify swing path. Ref. 1910.180(h)(3)(iii)(b)
-
Crane is free of leaks. Ref. manufacturer recommendation
-
Cr/Op remains at controls while lubricator is unsecured. Ref. 1910.180(h)(4)(i)
-
Cr/Op clear of area when testing or pumping. Ref. Rap54 16.1.10
-
F.E.'s charged, inspected, and ready for service. Ref. RP54 16.1.10
-
Additional Comments
Accumulator
-
Company
-
Accumulator is free of leaks.
-
Are Accumulators grounded?
-
Are fire extinguishers in place at each unit?
-
Connections have 1 male end & 1 female end.
-
Are restraints in place on all hoses? And are they properly rated for the application?
-
Open/Close clearly marked on handle. Ref. RP54 7.2.2, RP53 12.5.3f
-
Valve hand waits for signal before operating handle.
-
Accumulator 50 ft. Min. From well head. RP54 7.2.2
-
Valve hand has direct line of sight to well head.
-
Closing unit has crush resistant over hoses. Ref. RP53 12.5.2
-
Additional Comments
Light Plants/Generators
-
Company
-
Rig lighting and fixtures shall be of appropriate electrical classification for the area in which they are located. Ref. RP54 9.14.6, RP 500
-
Light fixtures should be placed Nd maintained to provide illumination for work areas. Ref. RP54 9.14.7
-
Light plants/generators shall be placed 100ft. From well. Ref. RP54 9.14.2
-
All electrical extension cords shall be properly insulated and plugs shall be in good condition. Ref. RP54 9.14.5
-
Light plants are grounded. Ref. RP 2003
-
Repairs shall not be made on light plants unless LOTO is performed and person is qualified. Ref. RP54 9.14.9
-
Additional Comments
Eye Wash Trailer
-
Company
-
Personnel know where eyewash trailer is located. Ref. 1910.151, Z358.1.5.4.2, RP54 4.4.1
-
Trailer clearly marked. Ref. Z358.1 5.4.3, 1910.145(c)(2)(i)
-
Tanks are full and have been tested daily. Ref. Z358.1 4.1.4
-
Water flows freely from eye wash and shower. Ref. Z358.1 5.1.6 & 4.1.4
-
Is the eye wash trailer charged and ready for use at all times?
-
Additional Comments
Personnel
-
Is all personnel on location wearing the proper PPE for the tasks being done?
-
Are all SSEs assigned a mentor? Ref. RP54 6.1.7
-
Are all personnel H2S awareness trained? Ref. API RP 49 5.1
-
Are all personnel operating equipment trained and certified on that equipment? (manlift, forklift, etc.)
-
Does each company on location have a JSA for their job and it is readily availble in their work area? Ref. RP54 6.1.7
-
SIMOPS is being coordinated through Co/Man. Ref. RP54 6.1.7
-
Personnel using spotters when backing.
-
Are personnel using tag lines and are they being inspected prior to use? . Ref. 1910.180(h)3()(vi), RP54 6.2.12
-
Is the proper fall protection being used while operating the manlift?
-
Is a 3ft lanyard being used while manlift is in motion?
-
Are all personnel signing in and out when entering/exiting pad? Ref. 1910.38(c)(4)
-
Are personnel using the designated smoking area? Ref. RP54 7.1.2-3
-
General housekeeping good (overall organization, free of trash, cigarette butts, etc.) Ref. RP54 6.5.1, 1910.22(a)(1)
-
Additional Comments
Chemicals
-
Company
-
Acid transport and all other tote tanks in containment.
-
Are all chemicals clearly labeled? Ref. 1910.1200(b)(1)
-
Are SDSs readily available for all onsite chemicals?
-
All personnel wearing proper PPE per SDS. 1910.1200(b)(i)
-
Are all transfer lines rated for use of chemicals? Ref. manufacturer recommendation
-
Are all transfer lines properly attached? (camlock handles secured)
-
Acid transport grounded. Ref. RP 2003
-
Additional Comments
Fuel Trucks
-
Company
-
Discharge valves, hose, and nozzles in good condition. Nozzle equipped with auto shut off. Ref. 1910.106(b)
-
Piping and fuel lines in good condition. Ref. 1910.106(b)
-
Fuel tanks properly labeled on all sides. Ref. RP54 8.4.1d, 1910.1200(f)(4-5)
-
Fuel lines not ran under equipment when not in use.
-
"No Smoking" signs erected on all sides. Ref. RP54 7.1.2-6
-
Vapor release vents elevated & away from ignition source. Ref. 1919.106(b)(2)(iv)(c)
-
General housekeeping. Ref. 1910.22(a)(1)
-
B/C class fire extinguisher available and identified. Ref. 1910.157(c)(1)
-
Splash filling prohibited.
-
Fill line & discharge velocity limited.
-
Grounded.
-
Contents on NON-FLAMMABLE storage tanks identified on all sides of tank(s). Ref. 1910.145(c)(2)(i)
-
Additional Comments
Misc. Equipment
-
Was a thourough inspection of the Forklift and Manlift completed (w/ pictures) upon arrival to the frac location? (by on-site supervision)
-
Has this inspection been submitted to HSE management?
-
Is all flow back and pump down iron properly restrained?
-
Is all flow back and pump down iron certified (1 year from date)?
-
Has a daily inspection been completed for the forklift?
-
Has a daily inspection been completed for the manlift?