Information

  • Title:

  • Rig Manager:

  • Rig #

  • Driller:

  • Supervisor:

  • HSE Tech/inspected by:

  • Spud Date

  • Location/Well

Dog House and Rig Floor Condition

  • 1. Handrails properly Installed

  • 2. Stairways installed properly and Secured

  • 3. Dog house pin and Cotter Pins installed

  • 4. Fire Extinguishers in place and tag up to date

  • 5. Safety Chains in place, across openings

  • 6. Proper Lighting in place with safety cables

  • 7. Safety Signs Posted

  • 8. Trash can cleaned and change lockers picked up

  • 9. Safety Harnesses in place and accessible

  • 10. Rig Floor clean and dry with No Slip material in buckets and available

  • 11. Drillers Table clean and Clear

  • 12. Drinking water available

  • 13. Area clean of trash and trip hazards in side doghouse

  • Add media

  • Comments:

Derrick and Substructure Boom/pipe wrangler

  • 1. Derrick pinned with Cotter Pins

  • 2. All lights working and with safety cables

  • 3. Standpipe clamps tightened and safety cables installed

  • 4. Top Drive kelly hose connected and secured with Whip Check

  • 5. Fall Arrest Working properly

  • 6. Winch Line properly installed

  • 7. Iron Rough Neck working Properly

  • 8. Tong Dies on Iron Rough Neck in working shape (visual inspection)

  • 9. Boom Working properly

  • 10. Fire Extinguishers in place and tag up to date

  • 11. Area under Substructure Clean and Clear from trash or tripping hazards

  • 12. Cat Walk Clean and Clear from trash or tripping hazards

  • 13. Checked oil on Swivel or Top Drive

  • 14. Greased Crown

  • 15. Greased ALL grease Fittings

  • 16. Inspected sheaves on block and on crown for any damage or bearing problems

  • 17. Ground Rods properly installed 6'

  • 18. Cellar jet hooked up and working

  • 19. Shale jet hooked up and working

  • Drilling line anchor made up with torque wrench (verify no slippage)

  • 20. Pipe racks in place and pipe chocked

  • 21. 2X4's picked up and stacked together

  • 22. Flow line bolts

  • 23. Swivel Kelley hose connected and secured

  • 24. Pipe Wrangler working and grounded

  • 25. Crown o matic functional, working properly

  • Comments:

  • Add media

Pump and Mud Pits

  • 1. All handrails installed properly with no damage

  • 2. All Stairways installed properly with no damage

  • 3. Fire Extinguishers in place and tag up to date

  • 4. Eye wash station installed and working properly

  • 5.Shale Shakers Working

  • 6. Lights all working and safety cables present

  • 7. Safety Signs in place

  • 8. Vibrating discharge hoses with safety cables, Clamp, Whip chain

  • 9. Water Lubrication Installed

  • 10. Walkways free from trash and trip hazards

  • 11. Ground Rods installed 6'

  • 12. Desander and dsiliter working properly

  • 13. Degasser working properly

  • 14. Mud mixing area clean and material properly stored

  • Comments:

  • Add media

Generator and HPU House

  • 1. Properly Grounded

  • 2. All Electric plugs installed properly

  • 3. Electric line off of Ground

  • 4. Proper lighting installed and working

  • 5. Area clean of trash and tripping hazards

  • 6. Barrels of oil and lubricant arranged neatly and in order to be used.

  • 7. Emergency light inside Gen house

  • 8. Proper lighting and with safety cables

  • 9. Breaker Box door closed

  • 10. Batteries in box and covered

  • Comments:

  • Add media

Fuel and Water Tank

  • 1. Properly Grounded

  • 2. Fire Extinguishers in place and tag up to date

  • 3. Electric Motor Hookup

  • 4. No Dirty gloves or ropes on pumps

  • 5. No Trash in area and no trip hazards

  • 6. No Water or Diesel Leaks

  • 7. Water Tank

  • 8. is upright diesel tank 3rd party

  • 9. Containment ditches clean and deep enough, where do they drain

  • 10. Proper lighting and with safety cables

  • Comments:

  • Add media

Bunk House and Tool Pushers’ Trailer

  • 1. Properly Grounded

  • 2. Fire Extinguishers in place and tag up to date

  • 3. Trash can outside crew quarters

  • 4. Smoking area clean with butt can

  • 6. Water and Sewer hookups and no leaks

  • 7. Smoke alarms working in living quarters

  • 8. Transformer for living quarters grounded

  • 9. Crew quarters steps level with hand rails

  • Comments:

  • Add media

General House Keeping

  • 1. Trash Cans in Place with Lids by Rig and by all trailers.

  • 2. All sensors on rig monitoring system are up and functioning

  • 3. All intercoms are working from rig floor to tool pusher’s cabin

  • 4. Rig horn working.

  • 5. Geronimo Line, Descending Device

  • COMMENTS:

Sign Off

  • COMMENTS:

  • OTHER:

  • Signature of inspector:

  • On site representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.