Information
-
Application Number & Address
-
Type of Inspection
-
Conducted on
-
Prepared by
-
Other Personnel
LEICHHARDT COUNCIL INSPECTION DETAILS
-
Date and Time Inspection Undertaken
-
Application Number
-
Name of Contact Person
-
Relation of Person met on site
-
Email / Phone
-
Other Persons on Site
PROPERTY INFORMATION
-
Number & Street
-
Suburb
- Annandale
- Balmain
- Balmain East
- Birchgrove
- Leichhardt
- Lilyfield
- Rozelle
-
Owner/s Name
-
Owner/s Email & Phone
-
OC Form has been lodged
-
Owner is required to submit OC form
-
Email OC form to owner
INSPECTION DETAILS
-
Type of Inspection
-
Work completed generally in accordance with the Development Consent and the approved plans
-
Any as built variations which are considered not inconsistent with approved plans
-
Window & Door openings in accordance with the approved plans
-
All Privacy Screens installed Satisfactory
-
Hard wired smoke alarms installed to BCA & AS3786
-
Fire rated construction previously inspected and Satisfactory
-
Final Survey provided and Satisfactory
-
Stormwater works completed in accordance with Engineer/Plumber details
-
Stormwater works completed in accordance with AS3500.3-Stormwater Drainage
-
Stormwater connection to Council gutter installed correctly
-
Landscape works in accordance with approved plans
-
Photos of satisfactory completion
BASIX COMPLIANCE
-
BASIX commitments installed [Visual inspection only such as light fittings, taps/shower fixtures]
-
Glazing specifications and shading devices in accordance with BASIX Certificate
-
Correct Hot Water System Installed
-
Correct Rain Water Tank Installed
-
Reuse of rainwater in accordance with BASIX
CERTIFICATION REQUIRED FOR OCCUPATION CERTIFICATE
-
Certification provided by competent persons must include: Company name and ABN; Property address; Type of work covered by the certificate; Standard of work (BCA clause or Australian Standard); Name, Signature & Date.
-
Termite Installation certification - from Licensed Installer
-
Glazing certification (windows,doors,shower screens) - from Manufacturer and Installer
-
Smoke alarm certification - from Licensed Electrician
-
Waterproofing of Wet Areas certification - from Licensed Installer
-
Stormwater & Drainage certification
-
Waste receipts for proper disposal of construction waste in accordance with Waste Management Plan
-
Letter of compliance - BASIX commitments Installed (ie. fixtures & fittings, insulation, glazing, shade devices, swimming pool)
-
Council completion letter for vehicle crossing & kerb and gutter
-
Final Dilapidation Report/s to be completed
INSPECTION RESULT
-
INSPECTION RESULT
-
Minor outstanding works which need satisfactory completion before issue of OC
-
Major issues which need completion prior to re-inspection
-
Prior to Issue of OC Consent Conditions Satisfied
-
Photos of Issues
-
Comments
-
Contact Council to arrange further inspection once work/issues are rectified