Title Page
-
Site conducted
-
Sub location
-
Conducted on
-
Prepared by
-
Location
Lift Plan
-
Brief description of lift
-
Is this a contractor specialist lift
-
Contractor Details
-
WAE Contact
The load
-
Details and description
-
Charachteristics
-
Weight of load
-
Centre of Gravity
-
Lifting points
Personnel
-
Appointed Person
-
Lifting Coordinator
-
Slinging signallers
Lifting Equipment
-
Equipment under the control of
-
Make Model
-
Working load Limit
Lifting accessories
-
Description with load limit
-
Description with load limit
-
Description with load limit
-
Description with load limit
-
Description with load limit
-
Is the Certificate of conformity/thorough inspection in place
-
is the lift open or blind?
-
What is the agreed method of signalling/communication
-
Is there a temporary works requirement?
-
Is the an appropriate demarcation of the lifting area using barriers and signs
-
Is there a requirement to control the load using tag lines
-
What re the ground conditions like?
-
Are there any hazards in proximity of the lift
-
Description of the lifting operation (attach drawing/pictures if necessary)
Sign Off
-
Originator
-
Date & Time
-
Appointed Person
-
Date & Time