Title Page
-
Document No.
-
Planned Lift Checklist
-
Conducted on
-
Personnel
-
Site
-
Does crane have a current. & valid LOLER certificate of thorough examination?
-
Describe the lift task
Company Undertaking Lift
-
Name of Company Undertaking the Lift
-
Have they submitted a lift plan?
-
Lift plan reference details
-
Have you read & reviewed lift plan?
Lifting Plant, Equipment & Personnel
-
Is crane's safe working load as detailed in lifting plan?
-
Does crane have a current & valid LOLER certificate of thorough examination?
-
-
Thorough Examination date?
-
Thorough Examination certificate expiry date?
-
Does lifting equipment/gear etc have a current & valid certificate of thorough examination?
-
Does crane operator hold a valid certificate of competence?
Lift Area & Immediate Surroundings
-
Is lift area suitably & sufficiently barriered off?
-
Area free of any potential for contact with overhead power lines, cabling or services?
-
Is access to lift area suitably controlled by banksmen?
-
Area free of any other potential overhead or peripheral obstructions (e.g. trees, walls etc)?
Local Conditions?
-
Are local conditions (e.g. wind, rain, snow etc) suitable for lifting?
Summary
-
Are you happy for lift to go ahead?
-
H&S Auditor 1
-
H&S Auditor 2