Title Page

  • Audit Category

  • Audit Title

  • Conducted on

  • undefined

DETAILS OF WORK

  • Plant/Equipment Name

  • Work at Height ID

  • Location of Work

  • Description of Work

  • Date of Work

  • Expected duration of Work

WORKING AT HEIGHT TYPE

  • Working on Roof

  • Please Read SOP

  • SOP Available

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Weather Conditions are suitable for Work

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Lighting Conditions adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All persons have completed working at height training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Harness/fall restraints inspected/tagged in date

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • The work area below barricaded to prevent falling object risk

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Roof anchor points inspected in date

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Working on Ladder

  • Please Read SOP

  • SOP Available?

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Weather Conditions are suitable for Work

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Lighting Conditions adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All persons have completed working at height training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • The work area below barricaded to prevent falling object risk

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Area is clear of overhead electrical hazards

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Pedestrian access to work are appropriately restricted

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ladders are AS stamped, in good condition and are appropriate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ladders are appropriated for the task and pre-inspected

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ladder is secured appropriately

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Operating Scissor Lift

  • Please Read SOP

  • SOP Available?

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Weather Conditions are suitable for Work

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Lighting Conditions adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • A pre-start checks of safety equipment completed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All persons have completed working at height training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • The work area below barricaded to prevent falling object risk

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Pedestrian access to work are appropriately restricted

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Area is clear of overhead electrical hazards

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Operating Boom Lift

  • Please Read SOP

  • SOP Available?

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • A pre-start checks of safety equipment completed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Weather Conditions are suitable for Work

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Lighting Conditions adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Structure/Work area has been inspected and assessed as safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Work platform inspected and assessed as operational and safe

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Appropriate EWP licenses sighted

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Harness/fall restraints inspected/tagged in date

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • The work area below barricaded to prevent falling object risk

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Pedestrian access to work are appropriately restricted

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All persons have completed working at height training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Area is clear of overhead electrical hazards

  • Suspend Permit, Please check with Permit Issuer/ Manager

TOOLS/EQUIPMENT TO BE USED AT HEIGHT (LIST)

  • Are you using tools/Equipment at Height?

IDENTIFY AND ISOLATE ENERGY SOURCES

  • Isolation Required

  • Electrical

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Pneumatic

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Hydraulic

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Stored Energy (Compressed Spring, Compressed Air, Hydraulic Pressure, Fluid Pressure)

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Fluid (Chemical, CIP, Product, Hot Water, Cold Water)

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

ISOLATION REGISTER

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

RESCUE PLAN

  • Rescue Plan Required

  • Rescue Type

  • Name of stand by First Aider

  • Communication Arrangements

  • Description of Plan

  • Emergency Equipment

  • Fall Arrest

  • Torch

  • Fire Extinguisher

  • First Aid kit

  • Mobilephone/Telephone

  • Lifeline and retrieval system

  • Communication Arrangements

EMERGENCY EQUIPMENT

  • Mobilephone

  • First Aid Kit

  • Torch

  • Communication Arrangements

  • Mobile phone

  • Walkie talkie

AUTHORISATION

  • I have reviewed the hazards and control measures documented in the relevant JSEA/SOP for this task. I believe that the work can be completed safely provided all the above-mentioned precautions and the relevant JSEA/SOP are complied with

  • Permit Issuer

  • Permit User

  • Permit User

  • Safety Observer

  • Name and Signature

PERMIT SUSPENSION

  • The permit has been suspended due to work not being completed. The following precautions have been completed in the work area

  • Area access restricted

  • Isolation retested

  • Equipment Secured

  • Signage in place

  • Area Manager notified

PERMIT REVALIDATION

  • This Permit has been revalidated to allow suspended work to be recommenced. The following precautions have been completed

  • Area Inspected

  • Environmental conditions safe

  • Pre-start checks completed

  • Area Manager notified

  • Permit Issuer

  • Permit User

COMPLETION OF WORK VERIFICATION

  • I have inspected the work area and certify that all personnel, tools and equipment have been removed from the area, all guards and covers have been replaced, all LOTO devices have been removed and all barriers and notices removed. I confirm that the area is safe for normal operations to resumes.

  • Permit Issuer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.