Title Page
-
Conducted on:
-
Location:
-
Supervisor Name:
Line Process Inspection
Inspection Checklist
Mixing and Dividing Area
-
Product Code of product being mixed:
-
Product Description of product being mixed:
-
Ingredient usage (kg) specified on formulation sheet is followed during scaling and mixing.
-
Are all the ingredient lot numbers recorded on formulation sheet correct.
-
Each ingredient bin has its own dedicated scoop.
-
Red scoop being used for allergen ingredients.
-
Yeast temperature in Bin (Record the current temperature)
-
Please record mixing times (Both Low and High values)
-
Please record dough temperature (°C)
-
Please record divider weights for 4 samples (grams), samples from each lane
Baking Area
-
Please record proofer temperature (Set 28°C/Actual °C)
-
Please record proofer humidity (Set 85%/Actual %)
-
Please record product set proof time.
-
Please record retarder temperature (Set 6°C/Actual °C)
-
Please record product set retarding time.
-
Temperature out of proofer:
-
Temperature out of retarder:
-
Correct seed topping being applied.
-
Deck Oven temperature (Set and Actual temperature (°C))
-
Rack Oven temperature (Set and Actual temperature (°C))
-
Product temperature out of oven (°C)
-
All topping ingredient lot numbers are recorded on "Lot Number Records" binder.
Toppings
-
Correct topping being used.
-
Correct topping amount being deposited on product.
Packaging Area
-
Product on the line:
-
Correct packaging being used on baggers.
-
Correct coding on the kwik lok/case.
-
Slicers performing as required?
-
Slice Dimensions:
-
Number of Slices:
-
Please record product internal temperature (°C).
-
Please record product weight (3 measurements) in grams.
-
Please record product length or diameter (3 measurements) in mm.
-
Please record product height (3 measurements) in mm.
-
Please record product width (3 measurements) in mm.
-
Please record product colour (3 measurements) in BCU using reference chart.
-
Are there any air holes present?
Product Performance
-
Please record product sensory score.
-
Does product parameters meet specifications?
Completion
-
Completed by:
-
Date and Time: