Information
-
Audit Title
-
Document No.
-
Client / Site
-
Job/Project No.
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Vehicle Registration No.
Photo of work site
-
Work site
JSA
-
Has JSA been completed correctly
-
Has the JSA been signed by all parties
Training
-
Have all personnel been trained for the task
Traffic Management
-
Signs appropriate for job
-
Signs well located and visible
-
Sufficient cones used
-
Signs in good condition
-
Appropriate vests in use
-
Work site well protected (personnel, plant, etc)
-
Personnel trained in traffic management
Worksite Gaurding
-
Pedestrian traffic managed
-
1.2 metre clearance for pedestrian traffic maintained, free of trip hazards
-
Open pits/manholes gaurded
-
Cones in use and correctly used
Personal Protective Equipment
-
Correct PPE in use and appropriate for task
-
Safety boots worn
-
Long sleeve shits and trousers worn
-
Safety glasses worn
-
Hearing protection worn
-
Gloves worn
-
Is the PPE well maintained ie. clean, not broken
-
UV protection in use (hats, sunscreen etc)
Gas Detectors
-
Gas detector calibrated and worn
-
Before entry manhole testing done (Test, Vent, Test, Monitor)
-
Gas detector reading is within acceptable limits and recorded (20.9, 0, 0, 0)
Vehicles
-
Vehicle registered and maintained
-
Fire extinguisher available and maintained
-
Sharps bin available
-
Invertor and aux battery operational
-
Visionstream Blue Book available and up to date
Chemicals/Substances
-
Are MSDSs available?
-
Are MSDSs up to date?
-
Have precautions been observed
-
Labelled clearly
-
Stored appropriately
Environmental
-
Risks and hazards identified
-
Are site specific requirements being followed?
-
All waste removed
First aid
-
First aid kit labelled
-
Contents within date, sealed, sterile etc
Manual handling
-
Assess material to be lifted
-
Use correct lifting techniques
-
Lifting aids use properly
Work Practices
-
Plant and equipment appropriately set up
-
Clean and tidy worksite
Electrical Tools
-
Test and tag in date
-
RCD used
-
Tools fit for use
Heat, working in hot conditions
-
Appropriate clothing worn
-
SPF 30 sunscreen in use
-
Utilise shade where possible
-
Drinking water available
Confined Space Entry
-
Confined space risk assessment complete
-
Entry permit complete
-
Standby person/safety observer on site
-
Personnel trained
-
Retrieval system in place
-
Communications established
-
Team leader notified prior to entry
-
Required PPE in place (ie, gas detector, fall arrest system, safety boots,, hard hat, gloves, etc) <br>
Asbestos
-
Use correct PPE - P2 Half face respirator, Disposable overalls, Disposable gloves
-
Wet down asbestos material
-
Use non powered tools
-
Asbestos bags used for disposing of asbestos
-
Asbestos disposed of in appropriate disposal bins.
Contaminated water
-
Water disposed of via Pump Truck
-
Use correct PPE
Dust
-
Isolations/Permits applied for and in place
-
Approved dust suppression methods/tools used
-
PPE used
Hoist
-
Hoist serviced and within date
-
Pre start inspection completed
-
Personnel trained and certified
-
Permits obtained
-
Warning signs in place
-
Emergency procedures documented
Humans, Insects and Animals
-
Site assessed for potential animals/insects
-
Pets restrained or removed
-
Correct PPE in use
Driving
-
Driving hazards identified and controlled
-
Seat belts worn
-
15 minute break after driving for 2 hours
Electrical - Communications racks/ DC systems
-
Equipment earthed
-
Mains Isolated
-
Jewellery removed
-
Double insulated tools in use
Electrical - Overhead
-
Test and tag in date
-
RCD in place
-
Tools fit for service
-
PPE in use
Fire
-
Emergency procedures available
-
No welding, grinding near ignition sources
-
No hot works in long grass during fire season
-
Fire extinguisher available
Sharps
-
Sharps bin available
-
Fibre offcuts placed in in Sharps bin
-
Sharps bin resealed at completion of task
Lasers
-
Eye protection in place
-
Video scope used
Lightning
-
Shelter taken
Self-Loading Trailer
-
Trailer serviced
-
Operator trained and competent
-
Pedestrians controlled
-
Ground surface flat/level
Trains
-
Staff have L1 rail safe training
-
Victrack approved vests worn
-
Rail protection plan in place
Working at heights - ladders
-
Ladder fit for duty
-
Work below safe working height of ladder
-
Ladder setup correctly
Working at heights - Poles
-
Visual inspection of pole completed
-
Push test completed
-
Hammer test completed ( wooden poles only)<br>
-
Ladder safety observed
Working at Heights - Roof
-
Roof checked for stability
-
Access to roof is secure and safe
-
Fall protection in place
-
People protected from falling material
Working hours, Fatigue
-
Team manager aware of after hours work
-
Breaks taken as required
-
10 hour break taken between shifts
Other hazards not identified above
Comments/issues observed
-
-
Photos of any issues observed
-
Photos of any issues observed
-
Photos of any issues observed
-
Photos of any issues observed
-
Photos of any issues observed
Signature
-
Auditor
-
Worker