Information

  • Department

  • Meeting leader

  • Conducted on

  • Audit by

  • The audit is divided into two sections. The first is "expert led" the second is "codified".

    This audit is for the Improving the Business / Systemic part of the Operating System.

EXPERT LED

Expert led

  • Department Implementation Plans displayed and progress monitored vs plan

  • Routine monitoring of Department and Project Team progress vs plan and on track

  • Routine monitoring of Department Tracc practices - TW, FI, VM vs plan

  • Routine monitoring and reporting of Department PIP savings

  • TF meetings with agenda, minutes and action plans in place and up to date

  • TF Code of Conduct, meeting evaluation and attendance in use

  • Department Loss & Waste analysis used to identify PIP/FITS

  • Accurate records of involvement in FIT/PIPs

  • FIT/PIP Register updated

  • Dept TF members skilled in Lion ways

  • Digitracc system utilised for all TRACC practices (Assessment, Planner, Improvements)

  • FIT/PIP boards up to date, as per standard, actions closed (>80%) and PDCA updated

  • FIT/PIP Practices Tracker updated

  • Routine monitoring and display of Department Financial Savings via PIP's

  • Display of project Financial Savings via PIP's

  • Formal process of implementation regularly reviewed - use of Project Boards, A3's, PDCA etc

  • Growing of internal capabilty in MEX regularly reviewed and monitored

  • Audits, Assessments continuously used (developed) to check MEX implemented as designed.

  • Formal process of Operational Standard Work a used / developed to sustain the gains.

  • Formal process of Leaders Standard Work used / developed to sustain the gains.

CODIFIED

Codified

  • MEX vision understood by all

  • Formal and documented systems for MEX, Foundation TRACC processes

  • Demonstrable understanding of Foundation TRACCs outside MEX Team

  • Detailed Loss and Waste entrenched in department through Task Force

  • Loss and Waste driving projects in department plan

  • Significant bottom line gains (50% improvement)

  • Formal improvement process for Projects, use of A3's and PDCA's in Task Force Tracking

  • Department Loss and Waste analysis driving pillar activity

  • Very effective improvement structures TF, Project Teams (Measure?)

  • Very effective deployment of BBP and LION MEX A3 into the dpartment

  • Very high levels of engagement at all levels in MEX, empowered (willing, able, allowed, accountable) with tangible results. (Measure?)

  • Deep understanding of LSW principles with good application

  • Foundation practises in the department entrenched - >3 for TW, 5S, VM, FI

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.