Title Page
-
Client / Site
-
Conducted on (Date and Time)
-
Inspected by
-
Location
-
Personnel
Human Factors and Behaviours
-
Does the Logistic Manager interact well with the client
-
Does the Logistic Manager interact well with the client
-
Does the Logistic Manager interact well with the client
-
Does the Logistic manager have control / respect from the rest of the team
-
Does the Logistic Manager represent the contractor well in site meetings
-
Are all instructions in site meetings understood
-
Are all e-mails polite and well mannered
-
Are safe behaviours being demonstrated, i.e. not complacent/distracted/rushing?
-
Are all operatives being polite and respectful to other site management / operatives
-
Has there been any unhappy recorded issues with any LLS operatives
-
Are all LLS operatives working safe around moving plant
-
Are all operatives being reactive to current site conditions
-
Are LLS standards in place and understood
Loading Bay / Zone
-
Banksman for reversing deliveries
-
Loading bay kept clean and tidy
-
Fire point
-
Adequate Signage
Storage Area
-
The Storage area is clean, tidy and clutter-free.
-
There are no unnecessary items in the work area.
-
There are no food and drinks in the work area.
-
Is there good access to materials
-
Information signage is displayed
-
Are pallets being used
-
Hazard signage is displayed
-
Signage is displayed level and clean
-
Stacked materials are placed on a flat and firm foundation.
-
Storage racks used are adequate for the task and in good condition.
-
Heavier and bulkier items are not stacked to high
-
Hazardous substances (e.g., flammable materials, toxic substances) are stored in compatible containers, stored under appropriate conditions and affixed with GHS labels.
Aisles, Walkways, Stairways, and Exits
-
There are no LLS Logistics / Paye materials blocking any walk ways
-
Lamps or light sources are clean and provide adequate illumination for working.
Working Areas
-
Working areas are clean, tidy and organised?
-
Physical barriers are installed around workplace hazards (e.g., sharp objects, protruding objects, bricks, floor opening etc).
Cutting / Mixing Stations
-
Are the cutting stations kept clean and tidy
-
Are the mixing stations kept clean and tidy
-
Is there hazard signage
-
Is there prohibitive signage
-
Signs displayed level and clean
-
Is there adequate PPE for operatives (i.e. Safety glasses , Aprons, Ear defenders etc)
Waste Management
-
Disposed of on a regular basis
-
Bins or skips provided
-
Waste stored in bins
-
Segregation of waste
Trip Hazards
-
Removed it possible
-
Trip hazards highlighted
-
Signage displayed to identify it
Plant and Machinery
-
safe use of plant and machinery
-
Operated by trained operatives only
-
Reporting issues or damages to PC
-
Lifting equipment and accessories checked and recorded
-
Forklift inspection
Lifting Equipment
-
Is all lifting equipment recorded in the site lifting register
-
is the working limit recorded on all lifting equipment
-
Is there a quarterly inspection tag displayed on all lifting equipment
-
Is the lifting equipment stored appropriately
-
is the lifting equipment inspected prior use by a competent person
-
Are all slings adequately protected when being used
-
Are tag lines used on all loads lifted or transported by cranes
-
Are mandatory safety latches fitted to lifting hooks
-
Is the work area adequately barricaded with Exclusion zones to control interactions with other work groups and plant / equipment
-
Are appropriate methods of communication implemented effectively between the crane operator and those assisting with the lift?
PPE
-
Required PPE worn by all operatives
-
PPE being worn correctly
-
Spare PPE for Operatives
-
Cleanliness
Delivery Management
-
Booking deliveries
-
DMS used
-
Management of deliveries
-
Daily reports issues
First Aid
-
First aid kit displayed for easy access
-
Eye was stations available
-
Trained first aider's displayed
Level of Knowledge
-
Site daily activities
-
Risk Management
-
Health and safety issues
Paperwork - Method statements & Risk Assessments
-
All relevant MSRA been submitted to the client
-
All MSRA made site specific
-
Relevant manual handling assessment attached
-
Lifting Plan submitted
-
Signed by supervisor
-
Confirmed by all operatives
-
MSRA approved
Paperwork - Toolbox Talks
-
Register
-
Correct choice of tool box talks
-
carried out weekly
-
Signed by all operatives
-
issued to the client
Completion
-
Contracts Managers Signature
-
Logistic Managers Signature