Title Page
-
Insert Date and Time of Delivery:
-
Prepared by
-
Equipment delivered
-
Is the unload team ready to unload the goods?
-
Offload equipment from delivery vehicle
-
Take photos of the area to show obstructions and contact Dornan or Mercury Management team
-
Please take photos of the equipment before & during offloading to show the following: • Packaging material damage or wet • Rigging Damage • Environmental damage (water heat etc.) • Transportation damage • Handling issues • Tie down features
-
Has a visual inspection of the equipment been performed once it has been offloaded and Photos taken on all sides to show packing condition.
-
Please take photos of the equipment in its storage position within the warehouse to show the following: • Packaging material damaged or wet • Cleanliness • Environmental damage (water heat etc) • Transportation damage • Handling issues
-
Eaton representative
-
GCS representative