Information
-
Development Name
-
Conducted on
-
Prepared by
-
Location
-
Select date
-
Add media
-
Additional Notes
Communal Electricity Meter Readings
-
Meter
Meter
-
Is the electrical cupboard clear of items (especially flammable items)?
-
Is the communal electrical testing in date?(5/10 year)
-
Meter reading
-
Meter address
-
Picture of meter
Assessment of Contracted Communal Duties
-
Cleaning
-
Window Cleaning
-
Grounds Maintenance
-
Add media
Internal Stairwell Inspection
-
Internal and External Lighting
Stairwell
-
Fault Address
-
Main door closing correctly
-
Door entry panel fully operational. Specify if codes are due to be changed
-
Surface mounted cables secure to walls & ceilings
-
Smoke Ventilation system intact
-
Fire alarm equipment in place and secure on ceilings and walls
-
Picto signs/fire emergency exit signs visible & secure on ceilings/ walls/ doors
-
Fire Doors opening correctly and secure
-
Dry risers doors securely closed over with door and signage intact
-
Communal service cupboards securely locked
-
Handrails securely fixed to walls
-
Communal carpet clean and secure
-
Stair treads and stringers in place
-
As per Fire Safety Scotland Regs 2006 and building insurance guidelines, are the exit routes and landings free from the storage of personal items.
-
Communal windows operational with handles and barriers intact
-
Lift operating correctly & handrails firmly secure
-
Lift lighting sufficient
-
Lift panel in tact and operational (including working lift line)
-
Loft hatches closed
-
Surfaces free of major scratches or dents
-
Notice board tidy and up to date with relevant information and site visit schedule
-
Ventilation fans operating correctly
-
Air fresheners intact
-
Ceiling tiles in place
-
Sockets, switches and light fittings fixed securely to walls & ceilings
-
Roofspace access free from debris. Main doors locked, authorised personnel only sign fitted
-
Communal cupboards clear of waste items
-
Communal Heating System/water pumps/sewage treatment plant operational & plant rooms clean, tidy and clear of fire/trip hazards
External Inspection
-
External lighting columns secure (check if street lighting is adopted)
-
Communal Satellite Systems secure with cables secure on buildings
-
Development free of unauthorised satellite dishes
-
Development free of Pest Control Issues i.e. vermin issues, dog fouling, bird excrement
-
Boundary walls & fences intact
-
Manhole Covers/ Drains/ Gullies Secure (Free of trip hazard)
-
Pavements/ Entrance Pathways/ Steps clean, flush & secure (Free of trip hazard)
-
Communal trees healthy and pruned to prevent any obstruction
-
External drains clear of debris (check if adopted)
-
Downpipes and gutters clear & intact
-
All visible roof tiles & ridges intact
-
Facia & Soffit boards intact
-
Brickwork/ render in satisfactory conditions (cracks, loose render or staining)
-
Lightning conductor secure to building
-
External handrails secure <br>
-
Is the roof anchor system maintained
-
Drying Area in good conditions, and clear of any trip or slip hazards
-
Car Park surface in satisfactory conditions
-
External roadway signage intact
-
External private signage secure i.e. private parking, regulation signs
-
External bicycle stores intact, clean, tidy and free of hazards
-
Bin stores intact, clean, tidy and free of hazards
-
External garages/car ports in satisfactory conditions
-
Water pumps operational, SUDs, pump room clean, tidy and free of fire/trip hazards
-
Play park equipment intact and operational
-
Grit bin levels satisfactory, check if adopted.
-
Is CCTV operational and maintained
-
Are there any areas with anti social damage requiring Local Authority intervention eg. Graffiti
Underground Carpark
-
Electric gate/ roller shutter operational & secure
-
Sufficient lighting in carpark
-
Pathways to communal doors/walkways clear to avoid any trip or slip hazards
-
Suitable parking restrictions signage (including height requirements)
-
Pedestrian Gate secure and closing over properly
-
Ventilation system/ fans operating
-
Underground Carpark free of obstruction and clear of fire/trip hazards
-
Communal drains within underground garage clear of debris
-
Parking (surface areas) in good condition
-
Other entrance/ exits doors secure
-
Electronic key pads intact. Specify if codes are due to be changed
-
Obstruction in underground car park-vehicles blocking dry risers, binstores etc
-
Areas with Anti Social damage needing Local Authority intervention eg. Graffiti
Proactive Maintenance Programme (Based on 10 Year Maintenance Plan)
-
Flooring Upgrade i.e. carpets, tiles etc
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Communal Tree Survey
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Additional Planting Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
External Redecoration Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Internal Redecoration Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Professional Building Survey
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Buildings Insurance Valuation
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Door Entry Replacement
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of Standard Lighting to LED Lighting
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
External Painting of Car Park Areas i.e. Line & Number Painting
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Drainage Clean Out
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of paving/ monoblock in Car Park Areas
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Re-Roofing Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Replacement of Communal Doors
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of Timber Soffits & Fascias to uPVC
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of existing garage / car park gates or systems
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade or Installation of CCTV Equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade or decoration works to Play Park Equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Add signature