Information

  • Development Name

  • Conducted on

  • Prepared by

  • Location
  • Select date

  • Add media

  • Additional Notes

Communal Electricity Meter Readings

  • Meter

  • Meter
  • Is the electrical cupboard clear of items (especially flammable items)?

  • Is the communal electrical testing in date?(5/10 year)

  • Meter reading

  • Meter address

  • Picture of meter

Assessment of Contracted Communal Duties

  • Cleaning

  • Window Cleaning

  • Grounds Maintenance

  • Add media

Internal Stairwell Inspection

  • Internal and External Lighting

  • Stairwell
  • Fault Address

  • Main door closing correctly

  • Door entry panel fully operational. Specify if codes are due to be changed

  • Surface mounted cables secure to walls & ceilings

  • Smoke Ventilation system intact

  • Fire alarm equipment in place and secure on ceilings and walls

  • Picto signs/fire emergency exit signs visible & secure on ceilings/ walls/ doors

  • Fire Doors opening correctly and secure

  • Dry risers doors securely closed over with door and signage intact

  • Communal service cupboards securely locked

  • Handrails securely fixed to walls

  • Communal carpet clean and secure

  • Stair treads and stringers in place

  • As per Fire Safety Scotland Regs 2006 and building insurance guidelines, are the exit routes and landings free from the storage of personal items.

  • Communal windows operational with handles and barriers intact

  • Lift operating correctly & handrails firmly secure

  • Lift lighting sufficient

  • Lift panel in tact and operational (including working lift line)

  • Loft hatches closed

  • Surfaces free of major scratches or dents

  • Notice board tidy and up to date with relevant information and site visit schedule

  • Ventilation fans operating correctly

  • Air fresheners intact

  • Ceiling tiles in place

  • Sockets, switches and light fittings fixed securely to walls & ceilings

  • Roofspace access free from debris. Main doors locked, authorised personnel only sign fitted

  • Communal cupboards clear of waste items

  • Communal Heating System/water pumps/sewage treatment plant operational & plant rooms clean, tidy and clear of fire/trip hazards

External Inspection

  • External lighting columns secure (check if street lighting is adopted)

  • Communal Satellite Systems secure with cables secure on buildings

  • Development free of unauthorised satellite dishes

  • Development free of Pest Control Issues i.e. vermin issues, dog fouling, bird excrement

  • Boundary walls & fences intact

  • Manhole Covers/ Drains/ Gullies Secure (Free of trip hazard)

  • Pavements/ Entrance Pathways/ Steps clean, flush & secure (Free of trip hazard)

  • Communal trees healthy and pruned to prevent any obstruction

  • External drains clear of debris (check if adopted)

  • Downpipes and gutters clear & intact

  • All visible roof tiles & ridges intact

  • Facia & Soffit boards intact

  • Brickwork/ render in satisfactory conditions (cracks, loose render or staining)

  • Lightning conductor secure to building

  • External handrails secure <br>

  • Is the roof anchor system maintained

  • Drying Area in good conditions, and clear of any trip or slip hazards

  • Car Park surface in satisfactory conditions

  • External roadway signage intact

  • External private signage secure i.e. private parking, regulation signs

  • External bicycle stores intact, clean, tidy and free of hazards

  • Bin stores intact, clean, tidy and free of hazards

  • External garages/car ports in satisfactory conditions

  • Water pumps operational, SUDs, pump room clean, tidy and free of fire/trip hazards

  • Play park equipment intact and operational

  • Grit bin levels satisfactory, check if adopted.

  • Is CCTV operational and maintained

  • Are there any areas with anti social damage requiring Local Authority intervention eg. Graffiti

Underground Carpark

  • Electric gate/ roller shutter operational & secure

  • Sufficient lighting in carpark

  • Pathways to communal doors/walkways clear to avoid any trip or slip hazards

  • Suitable parking restrictions signage (including height requirements)

  • Pedestrian Gate secure and closing over properly

  • Ventilation system/ fans operating

  • Underground Carpark free of obstruction and clear of fire/trip hazards

  • Communal drains within underground garage clear of debris

  • Parking (surface areas) in good condition

  • Other entrance/ exits doors secure

  • Electronic key pads intact. Specify if codes are due to be changed

  • Obstruction in underground car park-vehicles blocking dry risers, binstores etc

  • Areas with Anti Social damage needing Local Authority intervention eg. Graffiti

Proactive Maintenance Programme (Based on 10 Year Maintenance Plan)

  • Flooring Upgrade i.e. carpets, tiles etc

  • Communal Tree Survey

  • Additional Planting Programme

  • External Redecoration Programme

  • Internal Redecoration Programme

  • Professional Building Survey

  • Buildings Insurance Valuation

  • Door Entry Replacement

  • Upgrade of Standard Lighting to LED Lighting

  • External Painting of Car Park Areas i.e. Line & Number Painting

  • Drainage Clean Out

  • Upgrade of paving/ monoblock in Car Park Areas

  • Re-Roofing Programme

  • Replacement of Communal Doors

  • Upgrade of Timber Soffits & Fascias to uPVC

  • Upgrade of existing garage / car park gates or systems

  • Upgrade or Installation of CCTV Equipment

  • Upgrade or decoration works to Play Park Equipment

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.