Information
-
Development Name
-
Conducted on
-
Prepared by
-
Location
-
Add media
-
Additional Notes
Communal Electricity Meter Readings
-
Meter
Meter
-
Is the electrical cupboard clear of items (especially flammable items)?
-
Is the communal electrical testing in date?(5/10 year)
-
Meter Reading Here
-
Meter address
-
Picture of meter
Assessment of Contracted Communal Duties
-
Grounds Maintenance
-
Add media
-
Additional Notes
External Inspection
-
External lighting columns secure (check if street lighting is adopted)
-
Are there any common insured properties at the development?
-
Communal Satellite Systems secure with cables secure on buildings
-
Are the roof and gutters secure, clean and intact where visible
-
Development free of Pest Control Issues i.e. vermin issues, dog fouling, bird excrement
-
Boundary walls & fences intact
-
Manhole Covers/ Drains/ Gullies Secure (Free of trip hazard)
-
Pavements/ Entrance Pathways/ Steps flush, clean & secure (Free of trip hazard)
-
Communal trees healthy and pruned to prevent any obstruction
-
External drains clear of debris (check if adopted)
-
Car Park surface in satisfactory conditions i.e. no slip or trip hazards with parking bays identifiable
-
Signage intact including information signage ie. private parking, regulation signs
-
Bicycle stores intact, clean & tidy and free of hazards
-
Bin stores intact, clean, tidy and free of hazards
-
Water pumps/ SUDS/ Sewage Treatment plants operational & pump room clean, tidy (must be clear of fire & trip hazards)
-
Grit bin levels satisfactory, check if adopted.
-
Play park equipment intact and operational
-
Development free from anti social damage requiring Local Authority intervention eg. Graffiti
Proactive Maintenance Programme (Based on 10 Year Maintenance Plan)
-
Communal Tree Survey
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Additional Planting Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
External Painting of Car Park Areas i.e. Line & Number Painting
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Boundary Fence or Wall Upgrade
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Drainage Clean Out
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of paving/ monoblock in Car Park Areas
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade or decoration works to Play Park Equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Add signature