Information
-
Development Name
-
Conducted on
-
Prepared by
-
Location
-
Select date
-
Add media
-
Additional notes
Communal Electricity Meter Readings
-
Meter
Meter
-
Is the electrical cupboard clear of items (especially flammable items)?
-
Is the communal electrical testing in date?(5/10 year)
-
Meter Reading Here
-
Meter address
-
Picture of meter
Assessment of Contracted Communal Duties
-
Cleaning
-
Window Cleaning
-
Grounds Maintenance
-
Add media
-
Additional notes
Internal Stairwell Inspection
-
Internal and External Stairwell Lighting
Stairwell
-
Stair Address
-
How many Lights out and what floor
-
Main door closing correctly
-
Door entry panel fully operational. Specify if codes are due to be changed
-
Surface mounted cables secure to walls & ceilings
-
Smoke Ventilation system intact
-
Fire alarm equipment in place and secure on ceilings and walls
-
Fire doors opening correctly and secure
-
Picto signs/fire emergency exit signs visible & secure on ceilings/ walls/ doors
-
Dry risers doors securely closed over with door and signage intact
-
Communal service cupboards securely locked
-
Communal service cupboards securely locked
-
Handrails securely fixed to walls
-
Communal carpet clean and secure
-
Stair treads and stringers firmly in place
-
As per Fire Safety Scotland Regs 2006 and building insurance guidelines, are the exit routes and landings free from the storage of personal items, eg bikes, prams.
-
Communal windows operational with handles and barriers intact
-
Lift operating correctly & handrails firmly secure
-
Lift lighting sufficient
-
Lift panel intact and operational (including working lift line)
-
Loft hatches closed
-
Surfaces free of major scratches or dents
-
Notice board tidy and up to date with relevant information and site visit schedule
-
Ventilation fans operating correctly
-
Air fresheners intact
-
Ceiling tiles in place
-
Sockets, switches and light fittings securely fixed to walls & ceilings
-
Roofspace access free from debris. Main doors locked, authorised personnel only sign fitted
-
Communal Heating System/water pumps/sewage treatment equipment operational & plant rooms clean, tidy and clear of fire/trip hazards
-
Communal balcony area in good order, clear of debris and fit for access (if not to be accessed as a common part, the door to access this area must be locked)
-
Are there internal areas with anti social damage requiring Local Authority intervention
External Inspection
-
External lighting columns secure (check if street lighting is adopted)
-
Communal Satellite Systems secure with cables secure on buildings
-
Development free of unauthorised satellite dishes
-
Development free of Pest Control Issues i.e. vermin issues, dog fouling, bird excrement
-
Boundary walls & fences intact
-
Manhole Covers/ Drains/ Gullies Secure (Free of trip hazard)
-
Pavements/ Entrance Pathways/ Steps flush, secure and free of staining
-
Communal trees healthy and pruned to prevent any obstruction
-
External drains clear of debris (check if adopted)
-
Downpipes intact
-
All visible roof tiles & ridges intact
-
Facia & Soffit boards intact
-
Brickwork/ render in satisfactory conditions (staining, cracks or loose render)
-
Lightening conductor secure to building
-
External handrails firmly secure <br>
-
Is the roof anchor system maintained
-
Drying Area in good conditions, and clear of any trip or slip hazards
-
Car Park surface in satisfactory conditions i.e. no slip or trip hazards with parking bays identifiable
-
External signage secure (check if adopted)
-
Bicycle stores intact, clean & tidy and free of hazards
-
Bin stores intact, clean, tidy and free of hazards
-
Grit bin levels satisfactory (check if adopted)
-
Water pumps/ SUDS/ Sewage Treatment plants operational & pump room clean, tidy (must be clear of fire & trip hazards)
-
External garages/car ports in satisfactory conditions
-
Play park equipment intact and operational
-
Is the CCTV operational and maintained
-
Are there external areas with anti social damage requiring Local Authority intervention eg. Graffiti
Underground Garage/ Carpark
-
Electric gate/ roller shutter operational & secure
-
Sufficient Lighting in Carpark
-
Pathways to communal doors/walkways clear to avoid any trip or slip hazards
-
Suitable parking restrictions signage (including height requirements)
-
Pedestrian Gate secure and closing over properly
-
Ventilation system/ fans operating
-
Carpark/underground garage free of obstruction and clear of fire/trip hazards
-
Communal drains within underground garage clear of debris
-
Parking (surface areas) in good condition
-
Other entrance/ exits doors secure
-
Electronic key pads intact. Specify if codes are due to be changed
-
Obstruction in underground car park-vehicles blocking dry risers, binstores etc
-
Areas with Anti Social damage requiring Local Authority intervention eg. Graffiti
Gymnasium
-
Main doors closing over and locking correctly
-
Internal doors within gymnasium closing over & locking properly
-
Communal windows intact with secure handles
-
Gym equipment operating correctly
-
Electrical appliances PAT tested
-
Equipment clean & tidy including surrounding areas
-
Relevant signage displayed in gymnasium
-
Television secure and operational
-
Air conditioning operational with remotes or panels in working order
-
Air Fresheners intact
-
W.C. operational
-
Hand towels and soap present
-
Water supply working
-
Surfaces free from major scratches or dents
-
Add media
Concierge Office
-
Office clean, tidy and free of fire & trip hazards
-
Concierge uniform (check H&S work wear i.e. gloves, boots etc.)
-
Resident information securely locked away
-
Development maintenance certification current and with Property Manager
-
CCTV operational
-
Landline and or mobile phone operational
-
IT equipment operational
-
Suitable supply of lamps available
-
Relevant signage displayed in Concierge office
-
Boiler/ heating operating properly
-
Electrical appliances PAT Tested
-
Water supply satisfactory
-
Gas meter boxes secure
-
Concierge staff first aid training current
-
Actions instructed to site staff manager
-
Issues raised by site manager
Proactive Maintenance Programme (Based on 10 Year Maintenance Plan)
-
Flooring Upgrade i.e. carpets, tiles etc
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Communal Tree Survey
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Additional Planting Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
External Redecoration Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Internal Redecoration Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Professional Building Survey
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Buildings Insurance Valuation
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Door Entry Replacement
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of Standard Lighting to LED Lighting
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
External Painting of Car Park Areas i.e. Line & Number Painting
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Drainage Clean Out
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of paving/ monoblock in Car Park Areas
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Re-Roofing Programme
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Replacement of Communal Doors
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of Timber Facia & Soffit boards to uPVC
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade of existing garage / car park gates or systems
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade/renewal of gymnasium equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade or Installation of CCTV Equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Upgrade or decoration works to Play Park Equipment
- Due
- Not Due
- At Tender with Surveyor/Sub Contractor
- Proposal ballot issued to homeowners
- Rejected by homeowners within 12-36 months
- N/A
-
Add signature