Information
-
NAME
-
ADDRESS
-
SUBURB
-
ASSET ID #
-
Date and time of Inspection
-
APPROX decade of Construction
- Older than 1970
- 1970's
- 1980's
- 1990's
- 2000's
- 2010's
- 2020's
-
Comments if req.
EXTERNAL (Exclude roof)
-
External Photo
-
ARE THERE ANY DEFECTS?
DEFECT ..
-
PHOTO OF ISSUE
-
DEFECT DESCRIPTION
-
RECOMMENDED RESPONSE PRIORITY
-
APPROX COST
-
CONDITION SCORE FOR GENERAL STRUCTURE
- As New
- V.Good
- Good
- Good / Fair
- Fair
- Poor
- V.Poor
-
Average/Good <$2k, Average $2k - $5k, Below Average $5k - $10k, Poor > $10k
-
GENERAL COMMENTS....
ROOF (Covering and Battens)
-
Material of MAIN ROOF
- ZINC ALUM
- COLOURBOND
- TILES
- REINFORCED CONCRETE
- OTHER
-
Length of roof (m)
-
Width of roof (m)
-
ARE THERE ANY DEFECTS?
DEFECT ..
-
PHOTO OF ISSUE
-
DEFECT DESCRIPTION
-
RECOMMENDED RESPONSE PRIORITY
-
APPROX COST
-
CONDITION SCORE FOR ROOF (INC. GUTTERS AND DOWNPIPES)
- As New
- V.Good
- Good
- Good / Fair
- Fair
- Poor
- V.Poor
-
Average/Good <$2k, Average $2k - $5k, Below Average $5k - $10k, Poor > $10k
-
GENERAL COMMENTS ....
INTERIOR
-
ARE THERE ANY DEFECTS?
DEFECT ..
-
PHOTO OF ISSUE
-
DEFECT DESCRIPTION
-
RECOMMENDED RESPONSE PRIORITY
-
APPROX COST
-
CONDITION SCORE FOR INTERIOR
- As New
- V.Good
- Good
- Good / Fair
- Fair
- Poor
- V.Poor
-
Average/Good <$2k, Average $2k - $5k, Below Average $5k - $10k, Poor > $10k
-
GENERAL COMMENTS ...
SERVICES
-
Is there lighting / power?
-
Provide details .....
-
Is there a water supply ?
-
Provide details ...
-
Is GAS connected
-
Provide Details .........
-
Is there a toilet / toilets ?
-
Provide details ..
-
Is there any FIRE equipment?
-
Provide details. .....
-
CONDITION SCORE FOR SERVICES
- As New
- V.Good
- Good
- Good / Fair
- Fair
- Poor
- V.Poor
-
Average/Good <$2k, Average $2k - $5k, Below Average $5k - $10k, Poor > $10k
-
GENERAL COMMENTS ..
OVERVIEW
-
3 - Average/Good <$2k, 4 - Average $2k - $5k, 5 - Below Average $5k - $10k, 6 - Poor > $10k
-
Condition rating for WHOLE facility
- As New
- V.Good
- Good
- Good / Fair
- Fair
- Poor
- V.Poor
-
List any urgent works required:
-
List any CAPEX
-
Approx total repair costs identified
-
General comments or inclusions to annual operating costs :