Title Page

  • Actionable items require follow-up and documentation within 5 days of the inspection, sooner if possible.

  • Site:

  • Inspection Team:

  • Date:

  • Client Representatives:

  • JHSC Members:

  • Frequency:

HSE Inspection

HSE Inspection

1. CHEMICAL/ ENVIRONMENT

  • 1.1 Pre-Environmental Checklist

  • 1.2 Proper Storage

  • 1.3 Filter Fence/Straw Bales

  • 1.4 Water

  • 1.5 T.D.G.

  • 1.6 W.H.M.I.S.

  • 1.7 S.D.S.

  • 1.8 Spill Kits/Response

2. ELECTRICAL

  • 2.1 Correct Limits of Approach

  • 2.2 Signage Warning of Hazards

  • 2.3 Protective Barricades

  • 2.4 Ground Fault Circuit Interrupter

  • 2.5 Proper Grounding in Place

  • 2.6 All Panels Locked

  • 2.7 All Panels Kept Clear

3. WORKSITE DOCUMENTS

  • 3.1 Emergency Procedure Posted

  • 3.2 Health & Safety Policy Posted

  • 3.3 Standards / Procedures Available

  • 3.4 HSE Manual Available

  • 3.5 OHS Regulations Available

  • 3.6 Safe Work Plan Available

  • 3.7 Safety Meeting Minutes Posted

  • 3.8 HSE Inspections Posted

  • 3.9 SWAs in Place

  • 3.10 LSRs Posted

4. FIRST AID/MEDICAL

  • 4.1 First Aiders Identified

  • 4.2 First Aid Supplies Available

  • 4.3 First Aid Procedures Posted

  • 4.4 Facilities Sanitary

  • 4.5 Facility Hours Posted

5. WORKSITE CONDITION

  • 5.1 Equipment use

  • 5.2 Material Storage

  • 5.3 Power Tools

  • 5.4 Hand tools

  • 5.5 House Keeping

  • 5.6 Temporary Lighting

  • 5.7 Waste/Recycle

  • 5.8 Cords and Cables

  • 5.9 Fire Extinguishers

  • 5.10 Ergonomics

  • 5.11 Winter Ground Conditions

6. EMERGENCY PLANNING

  • 6.1 Plan is developed / Sufficient

  • 6.2 Posted in conspicuous location

  • 6.3 Contact #s available

  • 6.4 Plan has been communicated

  • 6.5 Drills Conducted

7. HAZARD WARNINGS

  • 7.1 Cones/Barricades

  • 7.2 Covers marked and secure

  • 7.3 Guardrails/handrails

  • 7.4 Signs/Signals

  • 7.5 Tags

  • 7.6 Warning flagging

  • 7.7 Defective tool removal system

8. LOTO

  • 8.1 Isolation points identified

  • 8.2 Isolation Verified

  • 8.3 Valves in correct position

  • 8.4 Locks / blanks/ blinds installed

  • 8.5 SWA in place

  • 8.6 JHA/SOP/SWP Reviewed

9. CONFINED SPACE

  • 9.1 Air Monitoring

  • 9.2 Barricades

  • 9.3 Lighting

  • 9.4 Ventilation

  • 9.5 Rescue Plan

  • 9.6 Safety Attendant/Monitor

  • 9.7 Workers Trained

  • 9.8 SWA in place

  • 9.9 JHA Reviewed

  • 9.10

10. FLHA

  • 10.1 Card completed

  • 10.2 Risk Properly Identified

  • 10.3 Reviewed by Supervisor

  • 10.4 All Persons Signed On

  • 10.5 Muster Area Identified

11. PERSONAL PROTECTIVE EQUIP.

  • 11.1 Body Protection

  • 11.2 Hi-Visibility Clothing

  • 11.3 Eye Protection

  • 11.4 Face Protection

  • 11.5 Fall Protection

  • 11.6 Foot Protection

  • 11.7 Hand Protection

  • 11.8 Head Protection

  • 11.9 Hearing Protection

  • 11.10 Respiratory Protection

  • 11.12 Biohazard PPE

12. TRAFFIC CONTROL

  • 12.1 Proper PPE being used

  • 12.2 Control plan in place

  • 12.3 Plan reviewed by workers

  • 12.4 Workers trained (as per role)

  • 12.5 Signage

13. TRENCHES & EXCAVATIONS

  • 13.1 Access and egress

  • 13.2 Cutbacks/Shoring

  • 13.3 Permits in place

  • 13.4 Spoil pile

  • 13.5 Workers Protected

  • 13.6 Inspections Performed

  • 13.7 Utility Locates Available

  • 13.8 Hand Digging/Vac Truck

14. HOT WORK

  • 14.1 Spark Containment

  • 14.2 Fire Extinguishers/Hose

  • 14.3 Combustibles Protected

  • 14.4. Ventilation

  • 14.5 Hot Work Permit

  • 14.6 Procedures Followed

  • 14.7

15. LIFTING OPERATIONS

  • 15.1 Crane Log Book

  • 15.2 Engineered lift

  • 15.3 Rigging Inspected

  • 15.4 Signaler identified

  • 15.5 Tag line used

  • 15.6 Procedures Followed

  • 15.7 Workers competent

  • 15.8 JHA Reviewed

  • 15.9 Outrigger Pads in Place

  • 15.10

16. PORTABLE EQUIPMENT

  • 16.1 Spill Containment

  • 16.2 Wheel Chocks

  • 16.3 Positive Air Shutoff

  • 16.4 Exhaust Directed Properly

  • 16.5 OTHER

17. VEHICLES / MOBILE EQUIP.

  • 17.1 Emergency equipment

  • 17.2 Equipment certified

  • 17.3 Log book and Manual

  • 17.4 Maintenance

  • 17.5 Operator certified

  • 17.6 Traffic control used

  • 17.7 Spotters Utilized

  • 17.8 Interior Clean

  • 17.9 Exterior Clean / Damage Free

  • 17.10 No visible leaks

  • 17.11

18. HYGIENE

  • 18.1 Washrooms Available

  • 18.2 Facilities cleaned

  • 18.3 Potable water available

  • 18.4 Waste disposal

  • 18.5 Toilet Stall Available

19. FALL PROTECTION

  • 19.1 Correct Equip Selected

  • 19.2 Condition

  • 19.3 Worn Correctly

  • 19.4 Worker trained

  • 19.5 Adequate anchor points

  • 19.6 Proper clearance maintained

  • 19.7 Fall protection plan/rescue in place

20. ELEVATED WORK

  • 20.1 Materials Stored Properly

  • 20.2 Open Holes Barricaded

  • 20.3 Grating Covered

  • 20.4 Area Below Barricaded

  • 20.5 Tools / Equipment Tied Off

  • 20.6 Procedures Followed

  • 20.7 OTHER

21. RIGGING

  • 21.1 Anchor Points Adequate

  • 21.2 Rigging rated for load

  • 21.3 Condition

  • 21.4 Used correctly

  • 21.5 Shackles used

  • 21.6 Shackle pins fully seated

  • 21.7 Shackles orientated correctly

  • 21.8 Lashing tight

  • 21.9 Correct number cable clips

  • 21.10 Clip orientation correct

  • 21.11

22. SCAFFOLDS/PLATFORMS

  • 22.1 Condition

  • 22.2 Construction

  • 22.3 Tagged correctly

  • 22.4 Correct Use

  • 22.5 Inspected

23. LADDERS / STAIRWAYS

  • 23.1 Condition

  • 23.2 Usage

  • 23.3 Clear Access / Egress

  • 23.4 Tied Off & Angle

24. COMPRESSED GASES

  • 24.1 Stored properly

  • 24.2 Secured/Upright

  • 24.3 Flashback/ Check valve

25. Public Safety

  • 25.1 Perimeter fencing secure/well defined

  • 25.2 Pedestrian pathway defined/maintained: free of trip hazards

  • 25.3 Signage directions/hazard awareness clear

  • 25.4 Disability access is accommodated or restored

  • 25.5 Tools/equipment secured/protected

  • 25.6 Excavations/trenches/hazards secure at end of shift

Follow-up

    ITEM REQUIRING FOLLOW-UP or CORRECTIVE ACTION (Act/Regulation/Code; Policy/Procedure)
  • No.

  • Target Date

  • Action By

  • Completion Date

  • Comments, Commendations and Safety Concerns:

Sign-off

  • Lodge Manager's Name and Signature

  • HSE Advisor's Name and Signature

  • JHSC Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.