Title Page

  • Prepared by

Site Details

  • Address
  • Meter Number

  • Prepared by

  • Conducted

Job Scoping

  • Is prestart scoping required? ie. Confirm site access, Check Phase Rotation

  • Is installation 3 phase

Record Phase Rotation RWB (L to R)

  • Recorded at Main Switch

  • Recorded at MIL

  • Take photo of Switches as found

  • Take photo of Switches as found

  • Proceed to next page

Setting the Scene

  • Are you ONLY Isolating a Service?

  • Proceed to LVCM 13.A - Isolation of an Installation

  • Are you ONLY Installing a Service and NOT connecting to the Consumer Mains?

  • Proceed to LVCM 13.B - Testing of an OH Service / Dedicated UG Service Cable

  • Are you Replace an Existing OH Service?

  • Proceed to Replace an Existing OH Service

LVCM 13.A - Isolation of an Installation

  • Isolation of an Installation

  • Refer to LVCM 13.A

LVCM 13.A: Isolation of an Installation

Step 1: Record Phase Rotation RWB (L to R / T to B)

  • Recorded at Main Switch

  • Recorded at MIL

Step 2: Advise

  • Advise customer supply will be interrupted

Step 3: At customers Main Switchboard

  • Record position of all Main Switches, CB’s and fuses

  • Turn off all Main Switches and CB’s

Step 4: At LV Mains

  • Remove all service fuses

Step 5: At the Main Switchboard

  • Using a proximity device Confirm Supply is De-energised

  • Test Consumer Mains Actives

  • Test Consumer Mains Neutral

Step 6: Disconnect/Isolate Installation from LV Network

  • ie: Remove OH Service and Hardware / Discoonect UG Consumer Mains from LV Pillar and Secure

LVCM 13.B - Testing of an OH Service / Dedicated UG Service Cable

  • Install Service - Left Disconnected at Point of Supply

  • Refer to LVCM 13.B

LVCM 13.B: Testing an OH Service / Dedicated UG Service Cable

Step 1: Install the Service and Secure

  • DO NOT CONNECT TO NETWORK

Step 2: At the LV Mains

  • Check System Normal

  • Single Phase

  • Test between LV Mains Neutral and LV Mains Active

  • Test between Independent Earth and LV Mains Active

  • Test between Independent Earth and LV Mains Neutral

  • Test between Independent Earth and LV Mains Active

  • Multi Phase

  • Test between LV Mains Neutral and each LV Mains Active

  • Test between Phases A-B, B-C, C-A

Step 3: Connect Service to LV Mains

  • In accordance with construction standards

Step 4: At LV Mains

  • Visually Confirm all Service Actives are fused, and

  • That the Service Neutral is connected directly to the LV Mains Neutral

Step 5: At the LV Mains

  • Insert Fuses

Step 6: At Service Tails Customers End

  • Prove Correct Connections

  • Single Phase

  • Using Voltmeter, Test between the Service Neutral and the Service Active

  • Using Proximity Tester, Test Service Active

  • Using Proximity Tester, Test Service Neutral

  • Using Proximity Tester, Test Neutral Bond Tail

  • Multiphase

  • Using Voltmeter, Test between Service Neutral and each Service Active

  • Using Voltmeter, Test between Phases A-B, B-C, C-A

  • Using Proximity Device

Step 7: At the LV Mains

  • Remove Service Fuses

Step 8: At Service Tails Customers End

  • Using a Proximity Device, Confirm the Service Neutral is NOT fused or Energised and Actives are NOT Energised

  • Test Service Active/s

  • Test Service Neutral

  • Test Neutral Bond Tail

Step 9: At Service Tails Customers End

  • Secure Service Tails

Replace an Existing OH Service - LVCM 13.A, 13.C & 13.D

Step 1: At the Main Switchboard Record Phase Rotation

  • Is Installation Three Phase

  • Recorded at Main Switch (L to R / T to B)

  • Recorded at MIL (L to R / T to B)

  • Move to Step 2

Step 2: Advise the Customer that Supply will be Interrupted

Step 3: At the Main Switchboard

  • Record position of all Main Switches, CB’s and fuses

  • Turn off all Main Switches and CB’s

Step 4: At the LV Mains

  • Remove all Service Fuses

Step 5: At the Main Switchboard

  • Using a Proximity Device, Confirm Supply has been De-Energised

  • MEN / Main Neutral as found

Step 6: At the Main Switchboard

  • Remove the MEN Connection and the Main Neutral/s from the Main Neutral Link and Secure

  • MEN / Main Neutral removed

  • Place coloured cable ties in the removed conductors Neutral Link Terminals i.e. Black Main Neutral, Green MEN

Step 7: At the Main Switchboard

  • Using a Multimeter on Ohms setting, Perform Continuity Test to confirm all Main Switches are OPEN

  • Test between LINE side of Main Switch and Neutral Link/s

Step 8: For a Service

  • Ensure that any Neutral Bonding Conductor is DISCONNECTED from metallic parts and secured

  • Install the Service and Connect to the Consumer Mains

Step 9: CONFIRM THE SWITCHBOARD IS PREPARED FOR CONNECTION and TESTING AT THE SWITCHBOARD IS IMMINENT

Step 10: At the LV Mains

  • Check System Normal

  • Single Phase

  • Test between LV Mains Neutral and LV Mains Active

  • Test between Independent Earth and LV Mains Active

  • Test between Independent Earth and LV Mains Neutral

  • Test between Independent Earth and LV Mains Active

  • Three Phase

  • Test between LV Mains Neutral and each LV Mains Active

  • Test between Phases A-B, B-C, C-A

Step 11: Connect Service / Consumer Mains to the LV Network

  • Visually Confirm all Service / Consumer Mains Actives are fused, and

  • That the Service / Consumer Mains Neutral is connected directly to the LV Mains Neutral

Step 12: At the LV Mains

  • Insert Service Fuses

Step 13: At the Main Switchboard

  • Prove Connections

  • Single Phase

  • Test between the Main Neutral and Line Terminal of the Main Switch

  • Test between Independent Earth and the Line Terminal of the Main Switch

  • Test between Independent Earth and the Main Neutral

  • Test between Independent Earth and the Customer's MEN

  • Test between Independent Earth and the Line Terminal of the Main Switch

  • Three Phase

  • Test between the Main Neutral and Line Terminal of the Main Switch

  • Test between Independent Earth and the Line Terminal of the Main Switch

  • Test between Independent Earth and the Main Neutral

  • Test between Independent Earth and the Customer's MEN

  • Test between Independent Earth and the Line Terminal of the Main Switch

  • Test between Phases A-B, B-C, C-A

Step 14: At the Main Switchboard

  • Perform Neutral Integrity Test (NIT) <=1

Step 15: At the Main Switchboard

  • Reconnect the Main Neutral and then the MEN to the Main Neutral Link

Step 16: At the Main Switchboard

  • Perform MEN Integrity Test - Test between an Earthed component and the Line Terminal of the Main Switch <=NIT

  • Take photo of Main Neutral Link

Step 17: At the Main Switchboard

  • If applicable, Check Phase Rotation is correct previously recorded in Step 1

Step 18: Neutral Bond

  • Test to ensure that the disconnected bonding conductor is NOT connected to the Service Active

  • Using a Proximity Device, Test Neutral Bond Tail

  • Using a Proximity Device, Test Service Attachment Point

  • Connect the Bond to the Service Attachment Point

  • Using a Proximity Device, Test Bonded Metalwork

  • Bonding Completed by

Step 19: At the Main Switchboard

  • Return all Main Switches / Circuit Breakers to the position noted prior to work being carried out

Step 20: At the Main Switchboard

  • Conduct Final Test and visually confirm that the Main Neutral and NEM are connected to the Main Neutral Link

  • Test Main Neutral Link ant the MEN connection

  • Take photo of Secured Switchboard

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.