Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
HANDOVER OF CURTAIN WALL
-
Type
- Phase
- Block
- Area
-
Elevation
-
Level
-
From Gridline
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
To Gridline
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
INSPECTION/QA
-
Has the curtain walling been surveyed for line and level?
-
Have the brackets been fitted and torqued to the correct setting?
-
Have the mullions and transoms been fixed, lined & levelled?
-
Have the gaskets been installed and glued correctly?
-
Glass to be inspected for imperfection
-
Has the glass been checked for size, and location before installation?
-
Comments
-
Add media
SIGNATURES
-
Checked on Behalf of M Price
-
Checked on Behalf of Barratt's