Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

HANDOVER OF CURTAIN WALL

  • Type

  • Elevation

  • Level

  • From Gridline

  • To Gridline

INSPECTION/QA

  • Has the curtain walling been surveyed for line and level?

  • Has the Stainless steel brackets been checked against sample brackets for quality and alignment?

  • Have the tapping threads been checked on the curtain walling for alignment and good working order?

  • Have the brackets been fitted and torqued to the correct setting?

  • Have the mullions and transoms been fixed, lined & levelled?

  • Have the gaskets been installed to schuco guidelines and glued correctly?

  • Have the mullion joints been sealed with flex 2 and joint seal caps filled with flex 2?

  • Hold point - Cladtech or Barratts sign checks

Has the glass inter layer consistent and all the way around

  • Is the inter layer and spacer bar installed correctly and the interlayer consistent and sealed around the face 2 of the glass?

  • Has all tape and excess mastic been removed around the edges ?

  • Glass to be inspected for imperfection and that the film is free from debris or imperfections?

  • Has the glass been checked for size, and location before installation?

  • Have the toggles and fixings been installed correctly to Schuco guidelines/ have the toggles been installed in the correct location to schuco spacings?

  • Have the thermal break and gaskets been damaged? <br>

  • Have the internal flashings been checked for damage or correct alignment before glass is installed? <br>

  • Has the mastic been check for colour and grade before starting?<br>

  • Hold point - Cladtech and Barratt,s inspection.

  • Has the mastic been installed or overseen by an approved Dow Corning installer and too there guidelines?

  • Is there drainage spouts installed and in the correct locations ?

  • Is the mastic applied evenly and smooth and free from the outer face of the glass?

  • Is the stainless steel brackets away from the face 4 glass?

  • Have the brackets been re-surveyed for the bries soliel installation ?

  • Have the EPDM's been installed and sealed correctly ?

  • Is the brise soleil installed correctly ?<br>

  • Add media

SIGNATURES

  • Checked on Behalf of M Price

  • Checked on Behalf of Barratt's London (Deemed Acceptable if not returned within 2 Days)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.