Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pressing and Mastic inspection check sheet

  • Client: Wates

  • Job title: Wembley Park-E01/E02

  • MPrice inspection

  • Location

  • Block or phase

Flashings.

  • Have all flashings been installed

  • Are flashings level

  • Have the correct brackets and fixings been used

  • Are flashings damaged free

Mastic works

  • Correct mastic spec used

  • Correct finish to mastic as per drawings

  • correct mastic joint installed? no less than 6mm

  • All mastic completed

Phot of works

  • Photo of works

Comments

  • Are there any comments

Signatures

  • On behalf of MPrice

  • On behalf of Wates

End of report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.