SFS & CP Board site inspection form
-
Client: Wates Construction
-
Job title: Wembley Park-NW07-NW08
-
MPrice Inspection time
-
Location
-
Block or Phase
Requirements
-
Are the latest revision elevations and detail drawings on site?
Inspection checklist:
Gridline/Datum
-
Is SFS set out correctly to gridline and/or datum?
Studs
-
Studs correct size?
-
Correct gauge?
-
Correct cross centres?
-
Noggins/Brackets correct?
-
Noggins/bracing correct?
-
Base track fixings both sides!
-
Head fixing as per detail?
Deflection
-
DHT - Present where appropriate?
-
Correct gauge?
-
Correct cross centres?
-
EDB - clip present at all jambs?
-
Defection screws positioned centrally?
Lintels/Cills
-
Correct types?
-
Correct fixings?
-
Cill plates installed correctly?
Jambs
-
Correct types?
-
Correct fixings?
-
Brick ties correct?
Head track
-
Fixed to sub-structure as per detail?
Base track
-
Level and/or packed correctly?
-
Fixed to the substructure as per detail?
CP Board
-
Correct 12mm calcium Board used?
-
Is Board cut to correct size?
-
Have the correct fixings been used?
-
Are fixings spaced within detail specs?
-
Is the CP Board clean and damage free?
Site alterations
-
Are there any site alterations?
Photos of installed SFS and CP Board
-
Photo of SFS Inspected
Drawings
-
Relevant drawings
Comments
-
Are there any comments?
Sign off
-
The below signatures deem all MPrice works mentioned In this report complete to drawings and handed over to Wates construction.
-
Checked on behalf of Mprice
-
Checked on behalf of Wates (deemed accepted if not returned by 17.00 2 working days after it is offered by MPrice)