Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Frame and patio door inspection check sheet
-
Client: Wates
-
Job title: Wembley Park-E01/E02
-
MPrice inspection
-
Location
-
Block or phase
Frame inspection
-
Is frame installed to gridline & datum?
-
Have correct fixings been used?
-
Have the correct packers been used?
-
Have the correct size lugs been used?
-
Are frame mitres intact and closed?
-
Are all frames damage free?
Doors & windows operational
-
Are doors and windows operational?
-
Do they open smoothly?
-
Do they lock and unlock?
-
Is correct restriction fitted?
-
are handles installed?
-
are cylinders installed?
-
Has the trickle vents been installed correctly and operating with the correct restriction?
-
All losefill insulation been installed?
Photo of works
-
Photo of works
Comments
-
Are there any comments
Signatures
-
On behalf of MPrice
-
On behalf of Wates