Information
-
PROJECT REF NO.
-
PROJECT NAME AND ADDRESS
-
INSTALLING CONTRACTOR
-
ROOF REF. (EG. SPORTS HALL)
-
PICTURE OF PROJECT
-
REASON VISIT
-
CONDUCTED BY
- Richard Storey
- Stewart Orton
- Frank Turner
-
DATE
-
Made 2 Measure Roofing Systems
Sunbeams - Cross Street
WINDERMERE
LA23 1AE
PROJECT VISIT
-
weather conditions
- Rainy
- Cloudy
- Sunny
- Damp
-
Project photo overview:
-
ROOFING CONTRACTOR PRESENT
- Yes
- No
-
GENERAL INFORMATION
-
Type project:
- Renovation
- New construction
- Renovation/new construction combined
-
Other remarks:
ROOF SURFACE
-
ROOF SUBSTRATE
- Profiled Metal Deck
- Timber
- Structural Concrete Slab
- Concrete Planks
- Other (refurb)
-
IF REFURBISHMENT PLEASE STATE
-
SUBSTRATE CONDITION
- Good
- Bad
- Attention Required
- MC Informed
- RC Informed
-
Overview picture(s) roof surface and/or drawing:
MATERIALS AND ROOF STRUCTURE
-
WATERPROOF COVERING
- M2M EPDM
- RESITRIX SKW
- HERTALAN EASY COVER
- CARLISLE SUREWELD
- RUBBERSHELL
-
Production number:
-
ROOF BUILD UP
- WARM ROOF
- COLD ROOF
- INVERTED
-
INSULATION TYPE
- FOIL FACED
- TISSUE FACED
- EPS laminated
- EPS not laminated
- XPS (inverted)
- MINERAL WOOL
- Other
- NONE
-
INSULATION THICKNESS
-
Vapour barrier:
- ALUTRIX 600
- VISQUEEN
- BITUMINOUS
- BUTYL
- OTHER
- N/A
-
Other:
-
Other remarks:
PROCESSING MEMBRANE
-
LAP WIDTH
-
WELDED LAP
-
VISIBLE BLEED 2-4MM
-
CORNERS ROUNDED
-
AUTOMATED WELDER
-
TEST WELD
-
ROOF EDGE DETAILS
-
UPSTAND DETAILS
-
INTERNAL CORNERS
- PREFORMED
- FOLDED
- PATCH AND TONGUE
-
EXTERNAL CORNER
- PREFORMED
- FOLDED
- PATCH AND TONGUE
-
RAINWATER/OVERFLOW OUTLETS
- COMPLETE
- INCOMPLETE
- NON APPLICABLE
-
ROOF PENETRATIONS
- PREFORMED KERB
- BUILDERS KERB
- SVP
- HVAC
- CABLE DUCT
- PIPE/PITCH POCKET
-
SYSTEM ACCESSORIES
- LIGHTNING CONDUCTOR CLIPS
- HANDRAIL
- FALL ARREST
- ACCESS LADDERS
- WALKWAY
-
OTHER COMMENTS
OBSERVATIONS AND RECOMMENDATIONS
-
OBSERVATIONS
-
IMAGE
-
COMMENTS
-
IMAGE
-
COMMENTS
-
IMAGE
-
COMMENTS
-
IMAGE
-
COMMENTS
-
IMAGE
-
COMMENTS
-
RECOMMENDATIONS
-
STATUS
- NO ACTION REQUIRED
- ATTENTION REQUIRED
- URGENT ATTENTION REQUIRED
- CONTRACTOR INFORMED
-
M2M REPRESENTATIVE
-
CONTRACTOR REPRESENTATIVE