Information
-
Wattle Street - Area - Activity - Task
-
WestConnex M4E - Parramatta Rd Civil
-
Safety Essential Verification - Working in and around Mobile Plant - Rev 1
-
Conducted on
Area Supervisor:-
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
Lead Inspector:-
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
Other members of the inspection team?
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
-
Another auditor
-
Has the task scheduling within the construction program ensured that mobile plant and equipment operation does not require any workers, light vehicles or other mobile plant or equipment to be working within any POZ.
-
If scheduling within the construction program ensured that mobile plant and equipment operation does not require any workers, light vehicles or other mobile plant or equipment to be working within any POZ, cannot be achieved has there been an appropriate barrier(s) erected;
- Has a physical barrier ben erected that stops mobile plant entereing an area where people are working
- Have barriers been erected that prevent people entering the Plant Operation Zones
-
Take Photo of the selected barriers in the area of inspection
-
Is mobile plant or equipment operating in the area temporarily halted, prior to a worker entering the POZ?
-
What actions are Mobile Plant operators taking, when personnel enter a POZ?
- Positive Communication is established
- Ground engaging tools are placed on the ground
- Opertors take hands away from levers
- Operators get out of plant and approach the person
- Plant continues to operate where personnel remains clear of slewing areas
-
Is the work group aware of hazards which can increase risk around mobile plant, i.e. position of spotters, sun glare, dirty windows on plant, failure of radio communication, assumption operators have seen pedestrian etc.?
-
What is the fall back method the work crew will adopt if communication is lost?
-
Are workers aware of the requirements to enter a POZ, such as all mobile plant or equipment in the work area must be temporarily halted?
-
Do workers entering POZ's temporarily display which of the following controls.
- Positive Communication is established
- Ground engaging tools are placed on the ground
- Opertors take hands away from levers
- Operators get out of plant and approach the person
- Plant continues to operate where personnel remains clear of slewing areas
-
Any comments from the inspectors?
Action required?
-
Action
-
Allocated to
-
Action due
-
Provide evidence action has been controlled or eliminated
-
Select date
-
Lead Inspector to sign
-
Other members of the inspection team to sign:
-