Information

  • M4E SWMS Infield Verification

  • WestConnex M4E - Parramatta Rd Civil

  • WestConnex M4E.png
  • Parramatta Road - Work Area:

  • SWMS Number:

  • SWMS Title:

  • Conducted on

Employer:-

Employer Supervisor:-

CSJ Representative

  • Another CSJ Rep:

  • Work Step Description currently being performed at time of Verification (Verbal Answer by Workgroup when asked)

  • Match to Description on SWMS?

  • Control Definition (discuss verbally with team and identify what controls the workgroup believe should be in place)
  • Risk (in workers words)

  • Above the Line

  • Control Description (in workers words)

  • Above the Line

  • Gap Analysis - (SWMS vs. Risk Identification and Control Definition, lower control in place vs. controls identified)
  • Risk (in SWMS)

  • Control Description - Gap between in field content discussion & SWMS content or controls which have not been implemented

  • Are controls listed in SWMS in place and effective:

  • Is the SWMS Located at the Job site?

  • Are personnel aware of emergency procedures and first aid for task?

  • SWMS location is known by workers?

  • Is SWMS in date and within review period

  • Has the SWMS modification page been used i.e. Content been added relevant to the task?

  • Any comments from the inspectors?

  • What action is required -

  • Employer Supervisor:

  • CSJ Rep:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.