Information
-
Area -
-
Conducted on
-
WestConnex M4E - Parramatta Rd Civil
-
M4E - WORKPLACE INSPECTION NO 20: REFUELING MOBILE PLANT
Area Supervisor:-
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
Lead Inspector:-
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
Other members of the inspection team?
-
Additional auditors
-
- Daniel Taylor
- Simon Baldwin
- MIchael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
-
Another auditor
-
Has a risk assessment been completed and recorded for refueling activities on the site?
-
Has the refueling requirements been communicated to workers on the site?
-
Have all workers who perform refueling duties been approved by the project manager?
-
Has preference been made to accommodate for permanent refueling areas?
-
Has a risk assessment been completed to allow refueling trucks to enter an operational work environment?
-
Has a VMP been produced for all refueling operations, does it include alterations or changes?
-
Has a SWMS been developed against the procedure and include, competency training and monitoring?
-
Does the fuel truck operator hold the appropriate licence and has been assessed for spill, fire prevention and control?
-
Has a site specific procedure been developed for the permanent refueling and does it include traffic movements?
-
Does the refueling truck have Safety Data Sheets's for all substances being carried and used?
-
Has the refueling truck operator undertaken a Daily Pre start check on the truck and refueling station/s?
-
Is the refueling area physically separated (exclusion zone) from operational plant in the immediate area?
-
Is there a Safe Zone for the operator to stand in whilst refueling?
-
Are signs erected to indicate NO ENTRY - REFUELING IN PROGRESS at each access way?
-
Are fire extinguishers and spill kits on the refueling truck or at the base refueling zone?
-
Please enter Items requiring action
Add action
-
Action Required:
-
Action assigned to?
-
Due Date
-
Provide evidence that the Corrective Action/s, has been completed controlled or eliminated.
-
Take photo of evidence to close
-
Date action closed
-