Information
-
Area -
-
Conducted on
-
WestConnex M4E - Parramatta Rd Civil
-
M4E - WORKPLACE INSPECTION NO 35 Working Near Live Traffic
Area Supervisor:-
-
- Daniel Taylor
- Simon Baldwin
- Michael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
- Karly Douglas
Lead Inspector:-
-
- Daniel Taylor
- Simon Baldwin
- Michael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
- Karly Douglas
Other members of the inspection team?
-
Additional auditors
-
- Daniel Taylor
- Simon Baldwin
- Michael Paton
- Ben Ashcroft
- David Wilson
- Brandon Leong
- Dave King
- Peter Masiororski
- Ben Forbes
- Vaughan Kimmins
- Mitch Stevens
- Bob Isaac
- John Kim
- Joe Vu
- Danielia Cullura
- Karly Douglas
-
Another auditor
-
Have all options been explored to eliminate the need for workers to work near live traffic?
-
Have relevant authorities including the client, local traffic authorities and police undertaken on road Projects to reduce speed limits?
-
What is the new speed?
-
Does the SWMS detail the hazards and controls specific to work near live traffic?
-
What are the controls that have been implemented to stop workers coming in to contact with live traffic?
- Road closure
- Road diversions or lane closure
- Tied in Concrete Steel Road barriers with deflection zone
- Traffic Management
- Truck Atenuators
- Shadow Vehicles
- Water Filled Barriers
- Cones or flagging
- Other
-
Has a Pre-Start Briefing been conducted? Did it contain all of the controls to be utilised to manage the risks associated with work near live traffic?
-
Has a traffic management plan been developed in accordance with the Safety Essential for Work near Live Traffic?
-
Are the controls nominated in the Traffic Management Plan (TMP) in place?
-
Are physical barriers in place in accordance with the TMP?
-
Take a photo of the barriers in place
-
Are the permanent or temporary physical barriers installed as per the manufacturers specifications?
-
Are all signs, barriers and delineation installed as per the approved TMP?<br>
-
Are pedestrian and vehicle exclusion zones clearly barricaded and signed and documented in TMP?
-
Is signage visible and correctly positioned with signage not in use covered to avoid confusion?
-
Take photos of the signage.
-
Is there after hours signage in case of emergency?
-
Have daily inspections been conducted of traffic control devices/signs for compliance to the TMP?
-
Project compound, work area access and egress are identified with clear signposting, traffic management and demarcated as required?
-
Please enter Items requiring action
Add action
-
Action Required:
-
Action assigned to?
-
Due Date
-
Provide evidence that the Corrective Action/s, has been completed controlled or eliminated.
-
Take photo of evidence to close
-
Date action closed
-
Lead Inspector to sign
-
Other members of the inspection team to sign: