Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Resume of Inspection
-
Inspections
-
Overall assessment
-
Inspector
Equipment Details
-
Equipment description
-
Equipment
Documentation
-
Shop test program approved by GL
-
Generator shop test by manufacturer
Measurements
-
Ambient air temperature and pressure
-
Maximum compression pressures were taken?
-
Maximum combustion pressures were taken?
-
Bearings Temperatures were taken?
-
Crankshaft deflection was measured?
Starting Test at No Load
-
Starting test was performed?
Safety devices and Alarms
-
L.O. low pressure alarm is working properly?
-
C.W. high temperature alarm is working properly?
-
Lube oil engine alarm is working?
-
Water level low alarm is working?
-
Low voltage alarm is working?
-
Three automatic start failure is working?
-
Overspeed stop is working properly?
-
Automatic start function is working?
-
Automatic stop function is working?
-
Emergency stop function is working?
Load Test
-
Test at 0% MCR load
-
Test at 25% MCR load
-
Test at 50% MCR load
-
Test at 75% MCR load
-
Test at 100% MCR load
-
Test at 110% MCR load
Governor Test
-
Governor response is acceptable?
Fuel Oil Consumption taken at 100%MCR
Torsional Vibration Measurements
-
Torsional vibration is acceptable?
Voltage Regulation Test
-
Voltage regulation is acceptable?
Overhauling of Set
-
Comments on overhauling of generator set
Conclusion
-
Final comments on inspection