Audit

Resume of Inspection

Inspections

Overall assessment

Inspector
Equipment Details

Equipment description

Equipment
Documentation

Shop test program approved by GL

Generator shop test by manufacturer

Measurements

Ambient air temperature and pressure

Maximum compression pressures were taken?

Maximum combustion pressures were taken?

Bearings Temperatures were taken?

Crankshaft deflection was measured?

Starting Test at No Load

Starting test was performed?

Safety devices and Alarms

L.O. low pressure alarm is working properly?

C.W. high temperature alarm is working properly?

Lube oil engine alarm is working?

Water level low alarm is working?

Low voltage alarm is working?

Three automatic start failure is working?

Overspeed stop is working properly?

Automatic start function is working?

Automatic stop function is working?

Emergency stop function is working?

Load Test

Test at 0% MCR load

Test at 25% MCR load

Test at 50% MCR load

Test at 75% MCR load

Test at 100% MCR load

Test at 110% MCR load

Governor Test

Governor response is acceptable?

Fuel Oil Consumption taken at 100%MCR
SFOC
Torsional Vibration Measurements

Torsional vibration is acceptable?

Voltage Regulation Test

Voltage regulation is acceptable?

Overhauling of Set

Comments on overhauling of generator set

Conclusion

Final comments on inspection

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.