Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Supervisor shall audit the packaging area operations daily. Check the "YES" box for a fulfilled specification or check the "NO" box for a non-conforming specification. Immediate corrective actions are to be taken to correct any non-conformance. If the inspection table is down or not in operation at the time of audit, check the N/A box provided
1.0 Safety
-
1.1 Are the proper PPE devices being used by all? (safety glasses, earplugs, and safety shoes)
-
1.2. Is the Emergency Spill Kit available at the work center / line / area?
-
1.3. Are the Equipment Safe-guards in place?
2.0 Docuentation
-
2.1 Is the Process Approval form completed and posted at the machine?
-
2.2 Is the Product Approval form completed and posted at the machine?
-
2.3 Are products identified according to G-109 (Labels and Transportation)?
-
2.4 Is the Production Order (PO) at the machine?
-
2.5 Are the SPC characteristics being recorded in Q-DOS
-
2.6 Are the forklift pre-operational inspection forms completed for the day?
-
2.7. Is the machine qualification less than 30 days old?
-
2.8. Is the Part List, Control Plans and Part DWG correct according to the PO?
-
2.9. Are the Inspection Instructions and CNC Packaging instructions correct according to the Part List?
3.0. Machining
-
3.1. Are the proper bins located at the machine cell? (Yellow -Rework/Red-Scrap)
-
3.2. Are the required inspections being performed by the operator according to the required inspection frequencies?
-
3.3. Are the inspection results being recorded on the inspection sheet?
-
3.4. Is the process in control?
-
3.5. Are the measurement devices in good condition?
-
3.6. Is gage master verification being performed?
-
3.7. Do Paka-Yoke's function properly?
-
3.8. Is the operator properly using the Paka-Yoke 's available for the operation?
4.0. Maintenance
-
4.1. Is preventative maintenance being performed according to the prior weeks schedule?
-
4.2. Is the machine free of Hydraulic leaks or excessive Grease at equipment?
Sign Off
-
Auditor's signature