Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Supervisor shall audit the packaging area operations daily. Check the "YES" box for a fulfilled specification or check the "NO" box for a non-conforming specification. Immediate corrective actions are to be taken to correct any non-conformance. If the inspection table is down or not in operation at the time of audit, check the N/A box provided

1.0 Safety

  • 1.1 Are the proper PPE devices being used by all? (safety glasses, earplugs, and safety shoes)

  • 1.2. Is the Emergency Spill Kit available at the work center / line / area?

  • 1.3. Are the Equipment Safe-guards in place?

2.0 Docuentation

  • 2.1 Is the Process Approval form completed and posted at the machine?

  • 2.2 Is the Product Approval form completed and posted at the machine?

  • 2.3 Are products identified according to G-109 (Labels and Transportation)?

  • 2.4 Is the Production Order (PO) at the machine?

  • 2.5 Are the SPC characteristics being recorded in Q-DOS

  • 2.6 Are the forklift pre-operational inspection forms completed for the day?

  • 2.7. Is the machine qualification less than 30 days old?

  • 2.8. Is the Part List, Control Plans and Part DWG correct according to the PO?

  • 2.9. Are the Inspection Instructions and CNC Packaging instructions correct according to the Part List?

3.0. Machining

  • 3.1. Are the proper bins located at the machine cell? (Yellow -Rework/Red-Scrap)

  • 3.2. Are the required inspections being performed by the operator according to the required inspection frequencies?

  • 3.3. Are the inspection results being recorded on the inspection sheet?

  • 3.4. Is the process in control?

  • 3.5. Are the measurement devices in good condition?

  • 3.6. Is gage master verification being performed?

  • 3.7. Do Paka-Yoke's function properly?

  • 3.8. Is the operator properly using the Paka-Yoke 's available for the operation?

4.0. Maintenance

  • 4.1. Is preventative maintenance being performed according to the prior weeks schedule?

  • 4.2. Is the machine free of Hydraulic leaks or excessive Grease at equipment?

Sign Off

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.