Pre Seal Checklist

PROCEDURAL CHECKLIST

  • Has pre start been held

  • Are all personal signed on to SWMS

Verification Checklist (Material Section)

  • Correct Agregate delivered

  • Correct bitumen onsite

Verification Checklist (Construction Section)

  • Proposed Lot achieved hold point clearance

  • Hinge point distance achieved

  • No Laminated edges present

  • Crossfall achieved within 3%

Verification Checklist ( Traffic Control)

  • Has signed copy been sighted

  • Is correct TGS being used for site

  • Is their sufficient TC personal to carry out proposed setup

  • Is all required signage onsite

  • Is site setup being conducted safely

  • Does your duty of care require this site to be shut down

  • Shut down site and report to Project Management

Notes and Comments

  • Any Notes and Comments

TEST RESULTS

  • Any Compaction results required

  • Attached results

NON-CONFORMANCE

  • Identified by Contractor.

  • Non conformity

  • Photos of non conforming item

  • Submitted

PRELIMINARIES

  • Services location complete

  • Underlying lot conforms

  • Surface approved

  • Design calcs & target applications submitted.

  • Evidence dry back moisture < 85%

  • Traffic management - staging of works.

  • Seal design received 10 days prior.

  • Nominated aggregates approved

  • Hold point prior to sealing released.

  • Contractor using compliant bituminous materials.

ANALYSIS OF AUDIT SAMPLES

  • Sealing aggregate gradings witnessed

  • Sealing aggregate pre-coated.

  • Sealing aggregate shape requirements

  • Aggregate durability and resistance to stripping.

  • Sealing aggregate free of adhered dust.

  • Bitumen class 170 residual.

  • Bitumen density > 1kg/l @ 15deg. C

  • Bitumen viscosity

  • Adhesion agent > 0.5% volume

  • Proposed 1st coat rate

  • Proposed 2nd coat rate

APPLICATION PROCESS

  • Plant onsite

  • Traffic control and warning signs.

  • Stop Slow Bats

  • Follow Me Vehicle

  • Temporary pavement markers.

  • Swept surface.

  • Minor surface defects repaired prior to seal.

  • Concrete & adjacent infrastructure protected.

  • Primer and bitumen temperature

  • Application temperature

  • Spraying technique

  • Aggregate pre-coated free of water/ dust.

  • Rolling methods

  • Embedment of aggregate

  • Seal width

  • Weather conditions

  • Wind drift concerns addressed.

  • Daily spraying sheets received.

  • Application rates achieved

  • Loose aggregate removed after sealing.

NON-CONFORMANCE

  • Identified by audit

  • Report requested

Signed off

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.