Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Seal Checklist
PROCEDURAL CHECKLIST
-
Has pre start been held
-
Are all personal signed on to SWMS
Verification Checklist (Material Section)
-
Correct Agregate delivered
-
Correct bitumen onsite
Verification Checklist (Construction Section)
-
Proposed Lot achieved hold point clearance
-
Hinge point distance achieved
-
No Laminated edges present
-
Crossfall achieved within 3%
Verification Checklist ( Traffic Control)
-
Has signed copy been sighted
-
Is correct TGS being used for site
-
Is their sufficient TC personal to carry out proposed setup
-
Is all required signage onsite
-
Is site setup being conducted safely
-
Does your duty of care require this site to be shut down
-
Shut down site and report to Project Management
Notes and Comments
-
Any Notes and Comments
TEST RESULTS
-
Any Compaction results required
-
Attached results
NON-CONFORMANCE
-
Identified by Contractor.
-
Non conformity
-
Photos of non conforming item
-
Submitted
PRELIMINARIES
-
Services location complete
-
Underlying lot conforms
-
Surface approved
-
Design calcs & target applications submitted.
-
Evidence dry back moisture < 85%
-
Traffic management - staging of works.
-
Seal design received 10 days prior.
-
Nominated aggregates approved
-
Hold point prior to sealing released.
-
Contractor using compliant bituminous materials.
ANALYSIS OF AUDIT SAMPLES
-
Sealing aggregate gradings witnessed
-
Sealing aggregate pre-coated.
-
Sealing aggregate shape requirements
-
Aggregate durability and resistance to stripping.
-
Sealing aggregate free of adhered dust.
-
Bitumen class 170 residual.
-
Bitumen density > 1kg/l @ 15deg. C
-
Bitumen viscosity
-
Adhesion agent > 0.5% volume
APPLICATION PROCESS
-
Plant onsite
- Light Vehicle
- Light Truck
- Emulsion Tanker
- Spray Truck
- Spreader Truck 1
- Spreader Truck 2
- Flat drum Multi Combination Roller
- Multi Roller
- Flat Drum Roller
- Tractor Broom
- Water Cart
-
Traffic control and warning signs.
-
Stop Slow Bats
-
Follow Me Vehicle
-
Temporary pavement markers.
-
Swept surface.
-
Minor surface defects repaired prior to seal.
-
Concrete & adjacent infrastructure protected.
-
Primer and bitumen temperature
-
Application temperature
-
Spraying technique
-
Aggregate pre-coated free of water/ dust.
-
Rolling methods
- Multi
- Multi flat combo
- Flat Drum
-
Embedment of aggregate
-
Weather conditions
- Sunny
- Overcast
- Windy
- Light Rain
- Heavy Rain
- Hot
- Cold
-
Wind drift concerns addressed.
-
Daily spraying sheets received.
-
Application rates achieved
-
Loose aggregate removed after sealing.
NON-CONFORMANCE
-
Identified by audit
-
Report requested
Signed off
-
Signature