Information
-
Contractor
-
Pressure Test Attempt
-
Conducted on
-
Prepared by
-
Location
Test Information
-
Size of Main
-
Length of Main Under Testing
-
Mains Material
-
The main held pressure at 1600kpa for 30 minutes
-
This is to certify that the main in question passed the required pressure testing and was witnessed by an SA Water officer.