Information
-
Site:
-
Audit Scope :
-
Auditor:
-
Date & Time :
-
DPM Project Number :
-
Water Authority :
-
Water Authority Project Number :
-
Water Authority Auditor :
-
Principal Contractor :
-
Water Contractor :
Potable and Recycled Water Mains Hydro-static Pressure Testing
-
Is testing being undertaken on potable water, recycled water or both?
-
Are Testing Gauges operating correctly and are in a good condition?
-
Are Testing Gauges within their calibration date?
Pressure Test Potable Water Main
-
Design head pressure the main is to be tested to. (kpa from Detail Sheet)
-
Total lengths of Main. (Total Meters from Detail Sheet, Table 1. New Pipe Schedule )
-
Is the percentage of "PE" Water main length greater than 5% of the total length of main?<br> % of PE = (Total PE Pipe Length/Total Pipe Length) X 100
-
Type of Test Nominated :- 15 Minute No Loss (+ or - 20Kpa) or 5 Hour Test (Formula attached)
-
5 Hr Pressure loss test. <br>Site 1
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage test Passed / Failed?
-
Site 2.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 3.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 4.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 5.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 6.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
15 Minute No Loss (+ or - 20Kpa) Test Site 1
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Stage Test Passed / Failed
-
Test Site 2
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Stage Test Passed / Failed
-
Test Site 3
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 4
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 5
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 6
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Has Potable Water Main Passed / Failed?
Pressure Test Recycled Water Main
-
Design head pressure the main is to be tested to. (kpa from Detail Sheet)
-
Total lengths of Main. (Total Meters from Detail Sheet, Table 1. New Pipe Schedule )
-
Is the percentage of "PE" Water main length greater than 5% of the total length of main?<br> % of PE = (Total PE Pipe Length/Total Pipe Length) X 100
-
Type of Test Nominated :- 15 Minute No Loss (+ or - 20Kpa) or 5 Hour Test (Formula attached)
-
5 Hr Pressure loss test. <br>Site 1.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage test Passed / Failed?
-
Site 2.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 3.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 4.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 5.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
Site 6.
-
Water added after 1st hour (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Calculation
-
Has Stage Test Passed / Failed?
-
15 Minute No Loss (+ or - 20Kpa) <br>Test Site 1
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Stage Test Passed / Failed
-
Test Site 2
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Stage Test Passed / Failed
-
Test Site 3
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 4
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 5
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Test Site 6
-
Start Pressure
-
Duration of Test
-
Finish Pressure
-
Loss over test time
-
Site Test Passed / Failed
-
Has Recycled Water main Passed / failed?
Property Connections (Main to Meter)
-
Where the Main to Meter Connections "Squirt" Tested?
-
Have all Connections Passed the Squirt Test?
EDLP Audit Check
-
Have the Kerb and Channels been formed?
-
Has the face of the Kerb been marked Correctly with All symbols? (G W R)
General Comments
-
undefined